BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 21, 2026 at 8:00 PM

Updated September 25, 2026

Site work and new construction of a playground / park / athletic field in Cibolo, Texas. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Design Build Services for New Intermediate School Playgrounds Question Deadline 08/31/2026 at 4:00 PM CT changed From 08/31/2026 as adda 1 Online Portal SCOPE OF SERVICES: Schertz Cibolo Universal City Independent School District, TX, is seeking qualified firms to provide Design-Build services in support of providing turnkey services for the assessment, design, demolition, replacement, and installation of Intermediate Playground Improvements. The selected firm shall secure any required services for the Project that are defined as professional services under the Professional Services Procurement Act, Chapter 2254 of the Texas Government Code (for example, registered professional land surveyors, professional architects and professional engineers using the qualifications-based selection process prescribed by that Chapter). Each architect or engineer or professional services firm that is a member of a design build team must be selected in this manner Work includes: Demo and remove existing play structures and soccer goals. Sitework and grading to prepare play areas, including retaining walls where required to establish proper grades and drainage. Note: Special attention needed at the Schlater site Removal and Replacement of existing swing equipment. Provide Alternative to Replace existing swings. Swing Area Provide a durable, impact resistant surfacing system beneath the swing area that is specifically designed to withstand heavy playground use, ensure kids safety and perform reliably under Texas climate conditions, including prolonged sun exposure, temperature fluctuations and precipitation. Provide Sunshade structure over the swing area. Replace sunshade on existing canopy structures Install new playground surfacing/substrate, including all necessary base materials. Install 60 x 40 synthetic turf field. Question Deadline 09/09/2026 at 4:00 PM CT

Post-Bid

$2,332,800.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
293
Active Projects
114
Bidding Soon
2,508
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2026

June 1, 2027

Project location map

230 Elaine S Schlather Pkwy, Cibolo, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.