Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 21, 2026 at 8:00 PM
Updated September 25, 2026
Site work and new construction of a playground / park / athletic field in Cibolo, Texas. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.
Design Build Services for New Intermediate School Playgrounds Question Deadline 08/31/2026 at 4:00 PM CT changed From 08/31/2026 as adda 1 Online Portal SCOPE OF SERVICES: Schertz Cibolo Universal City Independent School District, TX, is seeking qualified firms to provide Design-Build services in support of providing turnkey services for the assessment, design, demolition, replacement, and installation of Intermediate Playground Improvements. The selected firm shall secure any required services for the Project that are defined as professional services under the Professional Services Procurement Act, Chapter 2254 of the Texas Government Code (for example, registered professional land surveyors, professional architects and professional engineers using the qualifications-based selection process prescribed by that Chapter). Each architect or engineer or professional services firm that is a member of a design build team must be selected in this manner Work includes: Demo and remove existing play structures and soccer goals. Sitework and grading to prepare play areas, including retaining walls where required to establish proper grades and drainage. Note: Special attention needed at the Schlater site Removal and Replacement of existing swing equipment. Provide Alternative to Replace existing swings. Swing Area Provide a durable, impact resistant surfacing system beneath the swing area that is specifically designed to withstand heavy playground use, ensure kids safety and perform reliably under Texas climate conditions, including prolonged sun exposure, temperature fluctuations and precipitation. Provide Sunshade structure over the swing area. Replace sunshade on existing canopy structures Install new playground surfacing/substrate, including all necessary base materials. Install 60 x 40 synthetic turf field. Question Deadline 09/09/2026 at 4:00 PM CT
Post-Bid
$2,332,800.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 18, 2026
June 1, 2027
230 Elaine S Schlather Pkwy, Cibolo, TX
Related To This Project
Cibolo, TX
--
Cibolo, TX
--
Cibolo, TX
Bid Date: Sep 18 2026
Cibolo, TX
Bid Date: Sep 08 2026
Cibolo, TX
--
Cibolo, TX
Bid Date: Aug 06 2026
Cibolo, TX
Bid Date: Jul 09 2026
Cibolo, TX
--
Cibolo, TX
Bid Date: Jul 07 2026
Cibolo, TX
Bid Date: Jul 07 2026
Cibolo, TX
--
Cibolo, TX
--
Cibolo, TX
Bid Date: Jun 05 2026
Cibolo, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
