Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 23, 2026 at 8:00 PM
Updated September 29, 2026
Site work and renovation of a water / sewer project in Graniteville, South Carolina. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Installation of 368 linear feet of HDPE sanitary sewer pipe via pipe bursting, removal and replacement of one precast concrete manhole, implementation of bypass pumping, and restoration of disturbed surfaces including erosion control. The Project consists of furnishing all labor, materials, equipment and incidentals required to complete work in its entirety as shown on the Drawings and specified herein . Work includes permits, testing, cleanup, repairs, replacements and restoration required as a result of damages caused during construction. Comply with all applicable municipal , county, state, federal, and other codes. Contractor must be licensed and able to submit required bonds. Bonds: Bid Bond required (unspecified amount), Performance Bond required (unspecified amount), Payment Bond required (unspecified amount), Bid Bond required (unspecified amount), Performance Bond required (unspecified amount), Payment Bond required (unspecified amount). Question Deadline 09/09/2026 at 2:00 PM ET procurement@aikencountysc.gov The number of calendar days to achieve readiness for final payment from the Notice to Proceed for construction is 120 days The number of calendar days to achieve substantial completion from the Notice to Proceed for construction is ninety (90) days.
Post-Bid
$150,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 22, 2026
October 22, 2026
Jefferson Davis Hwy, Graniteville, SC
Related To This Project
Graniteville, SC
--
Graniteville, SC
--
Graniteville, SC
--
Graniteville, SC
--
Graniteville, SC
--
Graniteville, SC
--
Graniteville, SC
Bid Date: May 11 2026
Graniteville, SC
Bid Date: Jun 03 2026
Graniteville, SC
Bid Date: Jun 09 2026
Graniteville, SC
Bid Date: Apr 14 2026
Graniteville, SC
--
Graniteville, SC
Bid Date: Mar 10 2026
Graniteville, SC
Bid Date: Mar 24 2026
Graniteville, SC
Bid Date: Jan 16 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed