BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 9, 2026 at 8:00 PM

Updated September 15, 2026

Site work and renovation of a fire / police facility in Bowling Green, Kentucky. Working plans call for the renovation of a fire / police facility; and for site work for a fire / police facility.

**As of September 9th, 2026, project was cancelled. No definite date for the rebid** Roof replacement at Smiths Grove Volunteer Fire Department Station 1, Alvaton Volunteer Fire Department Station 3, and Browning Volunteer Fire Department Station 1. Questions regarding the bid documents must be submitted to Demir Salvar, Demir.Salvar@ky.gov, no later than five (5) days before the bid opening date. Site 1 Smiths Grove Volunteer Fire Department Station 1 120 S. Main Street, Smiths Grove, KY 42171 The proposed scope of work shall include: Install one layer of 1-inch polyisocyanurate board over one layer of Styrofoam flute filler over the existing roof, mechanically fastened per standard details. Install an Elevate white 0.060-mil TPO fully adhered roof system . Install shop-fabricated 24-gauge pre-finished galvanized steel metal in a standard color for the drip metal, gutter, downspouts, and new gravel stop. Install new gutter on both buildings and downspouts in the same locations as existing downspouts. Install gutter on both sides of the small attached walk-through area between the buildings, with one downspout on each side. Furnish a 20-year manufacturer's watertight warranty with a standard 55 MPH wind warranty. Provide cleanup and proper disposal of trash generated by the work. Flash the existing penetrations watertight. Provide wood nailers needed for the new metal trim. Install a vented ridge cap on the garage portion of the building per manufacturer details. Notes: Contractor shall verify all measurements and field conditions before submitting a bid. Owner shall select the standard color for new metal. Access to the roof for bidding purposes shall be coordinated through Demir Salvar at Demir.Salvar@ky.gov. Site 2 Alvaton Volunteer Fire Department Station 3 122 JFS Circle, Bowling Green, KY 42104 The proposed scope of work shall include: Main roof area: Install one layer of 1-inch polyisocyanurate board over one layer of Styrofoam flute filler over the existing roof, mechanically fastened per standard details. Main roof area: Install an Elevate white 0.060-mil TPO fully adhered roof system. Main roof area: Install shop-fabricated 24-gauge pre-finished galvanized steel metal in a standard color for drip metal, gutter extension, and new gravel stop on top of walls. Main roof area: Provide wood nailers for new metal trim, insulate and rubberize the roof side of walls fully up and over, and clean debris from the existing gutter. Tornado shelter area : Remove the existing white TPO membrane and insulation down to the concrete deck. Tornado shelter area : Install new 3-inch polyisocyanurate insulation adhered to the concrete in low-rise foam and install crickets at high walls to direct water to the gutter. Tornado shelter area: Install an Elevate white 0.060-mil TPO fully adhered roof system, new gutter, two downspouts in their current locations, and gravel stop on top of walls. Furnish a 20-year manufacturer's watertight warranty with a standard 55 MPH wind warranty, flash existing penetrations watertight, and provide cleanup and proper disposal of trash generated by the work. Notes: Contractor shall verify all measurements and field conditions before submitting a bid. Owner shall select the standard color for new metal. Access to the roof for bidding purposes shall be coordinated through Demir Salvar at Demir.Salvar@ky.gov. Site 3 Browning Volunteer Fire Department Station 1 3866 Browning Road , Rockfield, KY 42274 The proposed scope of work shall include: Install one layer of 1-inch polyisocyanurate board over one layer of Styrofoam flute filler over the existing roof, mechanically fastened per standard details. Install an Elevate white 0.060-mil TPO fully adhered roof system. Install shop-fabricated 24-gauge pre-finished galvanized steel metal in a standard color for the drip metal, gutter extension, and new gravel stop. Furnish a 20-year manufacturer's watertight warranty with a standard 55 MPH wind warranty. Provide cleanup and proper disposal of trash generated by the work. Flash the existing penetrations watertight. Provide wood nailers needed for the new metal trim. Notes: Contractor shall verify all measurements and field conditions before submitting a bid. Owner shall select the standard color for new metal. Access to the roof for bidding purposes shall be coordinated through Demir Salvar at Demir.Salvar@ky.gov. Smiths Grove Volunteer Fire Department Station 1 REROOF SPECS 120 S. Main Street, Smiths Grove, KY 42171 Install one layer of 1 " polyiso board over 1 layer of Styrofoam flute filler over existing roof mechanically fastened per standard details. Install an Elevate White TPO .060 mil fully adhered roof system. Install shop fabricated 24-gauge pre-finished galvanized steel metal standard color for the drip metal, gutter, downspouts and new gravel stop. Install new gutter on both buildings and downspouts in same location as they are now. Install gutter on both sides of small , attached walk through area from building to building with 1 downspout on each side. Furnish a 20-year manufacturer's watertight warranty with standard 55 MPH wind warranty. Include cleanup and proper disposal of our trash generated from our work. Include flashing in the existing penetrations watertight. Include the wood Nailers needed for the new metal trim to be installed. Install a vented ridge cap on the garage part of building per manufactured details. Alvaton Volunteer Fire Department Station 3 REROOF SPECS (MAIN ROOF AREA) 122 JFS Circle, Bowling Green, KY 42104 Install one layer of 1 " polyiso board over 1 layer of Styrofoam flute filler over existing roof mechanically fastened per standard details. Install an Elevate White TPO .060 mil fully adhered roof system . Install shop fabricated 24-gauge pre-finished galvanized steel metal standard color for the drip metal, gutter extension and new gravel stop on top of walls. Furnish a 20-year manufacturer's watertight warranty with standard 55 MPH wind warranty. Include cleanup and proper disposal of our trash generated from our work. Include flashing in the existing penetrations watertight. Include the wood Nailers needed for the new metal trim to be installed. Include insulating and rubberizing roof side of walls fully up and over. Clean debris out of existing gutter 1 . Alvaton Volunteer Fire Department Station 3 REROOF (TORNADO SHELTER AREA) Remove existing white TPO membrane and existing insulation down to concrete deck. 2. Install new 3" polyiso adhered down to concrete per standard details in low rise foam. Install crickets at high walls to move water to gutter. 12345 Install an Elevate White TPO .060 mil fully adhered roof system . 5. Install shop fabricated 24-gauge pre-finished galvanized steel metal standard color for the new gutter, 2 downspouts in same spot as they are now and gravel stop on top of walls. 6. Install new gutters in this area only. 12 Furnish a 20-year manufacturer's watertight warranty with standard 55 MPH wind warranty. Include the wood Nailers needed for the new metal trim to be installed. Include flashing in the existing penetrations watertight.

Final Planning

$500,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
81
Bidding Soon
1,385
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2026

March 9, 2027

Project location map

Multiple Locations, Bowling Green, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.