Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 28, 2026 at 8:00 PM
Updated September 3, 2026
Environmental remediation for a development in Vernal, Utah. Completed plans call for environmental remediation for a development.
Administer EWMF herbicide in a lake near Vernal. Question Deadline 08/21/2026 at 2:00 PM MT Online A lake-wide treatment of ProcellaCOR will be administered in two phases in back-to-back years to eradicate the EWMF. Phase 1 will treat approximately half of the lake in 2026 and Phase 2 will treat the remaining half in 2027. The Phase 1 treatment will need to be completed in the first week of September when EWMF is still actively growing to be most effective. Hire a licensed and experienced application company to supply and administer EWMF herbicide to Pelican Lake to eradicate/control the invasive plant. Pelican Lake is approximately 1,800 surface acres at full capacity and is relatively shallow with a max depth of 20 feet. At the time of treatment the lake will be at most half full . The partial capacity right now is 650 surface acres with this project the plan is to complete half the lake at 325 surface acres. It is a flow through lake with an inlet and an outlet. The treatment would need to take place during the first week of September, 2026. At this time, because of water levels, there would be no inflow or outflow water into Pelican. Phase 1 will consist of a treatment of ProcellaCOR to approximately half of the lake, with the remaining half treated under Phase 2 the following year.
Bid Results
$255,125.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2026
September 28, 2026
Pelican Lake, Vernal, UT
Related To This Project
Vernal, UT
Bid Date: Sep 17 2026
Vernal, UT
Bid Date: Sep 10 2026
Vernal, UT
--
Vernal, UT
Bid Date: Jul 31 2026
Vernal, UT
Bid Date: Aug 27 2026
Vernal, UT
Bid Date: Aug 11 2026
Vernal, UT
--
Vernal, UT
--
Vernal, UT
Bid Date: Jul 31 2026
Vernal, UT
Bid Date: Jun 18 2026
Vernal, UT
Bid Date: Jun 10 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
