Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 29, 2026 at 8:00 PM

Updated September 27, 2026

Environmental remediation for a development in Vernal, Utah. Completed plans call for environmental remediation for a development.

Administer EWMF herbicide in a lake near Vernal. Question Deadline 08/21/2026 at 2:00 PM MT Online A lake-wide treatment of ProcellaCOR will be administered in two phases in back-to-back years to eradicate the EWMF. Phase 1 will treat approximately half of the lake in 2026 and Phase 2 will treat the remaining half in 2027. The Phase 1 treatment will need to be completed in the first week of September when EWMF is still actively growing to be most effective. Hire a licensed and experienced application company to supply and administer EWMF herbicide to Pelican Lake to eradicate/control the invasive plant. Pelican Lake is approximately 1,800 surface acres at full capacity and is relatively shallow with a max depth of 20 feet. At the time of treatment the lake will be at most half full . The partial capacity right now is 650 surface acres with this project the plan is to complete half the lake at 325 surface acres. It is a flow through lake with an inlet and an outlet. The treatment would need to take place during the first week of September, 2026. At this time, because of water levels, there would be no inflow or outflow water into Pelican. Phase 1 will consist of a treatment of ProcellaCOR to approximately half of the lake, with the remaining half treated under Phase 2 the following year.

Award

$255,125.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
8
Bidding Soon
81
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2026

September 28, 2026

Project location map

Pelican Lake, Vernal, UT

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed