Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 18, 2026 at 8:00 PM

Updated November 15, 2026

Site work and new construction of a mixed-use development in Muskogee, Oklahoma. Completed plans call for the construction of a 69,000-square-foot, three-story above grade fire / police facility; and parking garage.

1. Proposal shall be per scope , plans, and specifications. 2. Verify project tax status before bidding. Include all applicable sales and use taxes *if* taxable. 3. Expedited shop drawings and submittals to avoid delivery delays or cost increases due to slow procurement. 4. Subcontractor shall be responsible for the cleanup of materials generated during the work of this subcontract. Dumpster will be furnished by others. 5. Daily cleanup and sweeping of existing streets or other improvements soiled by the work of this package. 6. This will be a clean and safe project. All trades are required to clean up their work area daily per contract requirements. Williams Contracting will bring cleaning crews on site as needed if trades fall behind in their cleanup. The cost of this cleaning labor will be shared among the trades on site. 7. All food, drinks, and radios must be kept out of the construction site. Trades may keep these items in their vehicles or their container, but not in the building. 8. Furnish, install, and remove any temporary protection required for protecting existing building finishes from damage due to the work of this agreement. 9. All trades to obtain and maintain on site, their own full set of bid documents, plans, and addenda. 10. All trades working on site or coming on site within two weeks to start their work will be required to attend regular jobsite coordination meetings. These meetings must be attended by a company representative with manpower and financial authority for their company. 11. All touch-up painting of factory finished items furnished in this proposal. 12. As-built drawings as called for. 13. All necessary and required testing and certificates per the contract documents, code, and governing authorities. 14. All hoisting, scaffolding, and equipment required for the completion of the work called for in the contract documents. 15. All deliveries must be coordinated with the Construction Manager's project staff prior to shipping. 16. Subcontractors and suppliers will be responsible for timely submission of all submittals including , but not limited to, shop drawings, samples, product data, MSDS information, warranties/guaranties , operation and maintenance manual, and all other submittals as required by the contract documents. 17. Traffic control and flagman for trucks entering or leaving the site. Requests for clarification or interpretation of the Bid Documents shall be made in writing or by telephone to: Williams Contracting, Inc. - 918-682-5511 4013 Tull Ave. Muskogee, OK 74403 Project No. G2025126-2 Construction of new Bass Reeves Memorial Complex and rural sites including access flooring, covered parking structures, and low voltage systems. Bonds: 5% Bid Bond, Certified Check required.

Post-Bid

$3,700,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
86
Bidding Soon
1,152
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2026

November 1, 2026

Project location map

Multiple Locations, Muskogee, OK


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed