Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 4, 2026 at 7:00 PM
Updated November 9, 2026
Site work and new construction of a municipal facility in Dublin, California. Completed plans call for the construction of a municipal facility.
Installation of a manual Bi-parting steel rolling security gate system, including all labor, materials, parts, and equipment for a turn-key project. Anticipated Award Date: December 3, 2026 All questions about the meaning or intent of the Contract Documents are to be directed in writing online to County through the "Question & Answer" feature in the County of Alameda Procurement Portal. Question Deadline date added in Description as per Q and A Docs Written Question Deadline:October 20, 2026, 5:00pm The Project consists of: Turnkey Manual Dual Swinging Gate System for SRJ Jail Vehicle Access Gate Replacement. Provide a complete turnkey replacement of the existing vehicle security gate with a new manual Dual Swinging Gate System. This includes installation, all labor, materials, equipment, field verification, fabrication, transportation , demolition, fencing, gate hardware, locking hardware, security components, testing, adjustment, restoration, and cleanup. The budgetary estimate for the scope of work is approximately $ 75,000. The time to complete this project is (90) calendar days from the Notice to Proceed The Work of this Contract may consist of the following: 1. Contractor shall furnish all expertise, labor, materials, parts, equipment, and incidentals necessary to provide a complete Rolling Gate Install project at the Santa Rita Jail , located at 5325 Broder Blvd, Dublin, CA 94568. 2. Contractor shall provide a complete rolling gate install project which consists of the following: a. Install 2 Swinging Gates 13' tall 15' wide each hinged on 6-5/8" posts for each. b. Install larger 6-5/8" post a foot behind the existing 4" post. c. Install new 6-58" post 10' to the right to give overall 10' opening. d. Posts must be set in concrete 5' deep with a 24" footing diameter e. Contractor will remove left over chain-link fencing and install new chain-link from existing fence to new posts on both sides. i. Must match existing security coverage. f. Center security sleeve/interlocking system must match existing padlock operations. g. Removal of existing gates must wait until after acceptance of the new system by the Alameda County General Services Agency (GSA) and Alameda County Sheriff's Office (ACSO). h. All items reasonably required for a complete operation system shall be included in the base bid. i. Security During Construction i. The existing gate shall remain operational until the new system is fully installed, tested, secured, and accepted. ii . Contractor shall maintain a secure perimeter throughout construction. iii . Existing gates shall not be removed until the replacement gate is fully operational and accepted. Any temporary security measures required during construction shall be included in the base bid. j. Gate Construction i . Provide heavy-duty welded steel gate construction suitable for correctional facility use. ii . Structural steel tube framing. iii. Security-grade welded construction. iv. Chain-link fabric matching existing fence. v. Reinforced center and locking areas. vi. Corrosion-resistant exterior finish. vii. All required brackets, plates, hardware, fasteners, welds, and reinforcement. viii . Final dimensions shall be based on field verification. k. Fence Modifications i . Modify existing fencing as required to accommodate the new gate while maintaining continuous perimeter security. ii. Match existing fence height, fabric, finish, and general appearance. iii . Final dimensions and locations shall be field verified. I. Concertina Wire i. Provide matching concertina wire on both gate leaves, including all brackets, supports, reinforcement, and attachment hardware. ii. Installation shall not interfere with gate operation, center sleeve, locking system, guides, or stops. m. Shop Drawings/ACSO and GSA Approval i. Because no construction drawings are provided, contractor shall prepare shop drawings based on this SOW and field-verified conditions. ii. Submit shop drawings to ACSO and GSA/BMD for review and approval prior to fabrication. iii . Provide enlarged details for the center sleeve/locking assembly and rear guide/capture system. iv . No fabrication or removal of existing gates shall occur until required shop drawings are approved by ACSO and GSA. v. Approval does not relieve the contractor of responsibility for field dimensions, fit, structural adequacy, security, or proper operation. n . Testing/Final Acceptance i . Contractor shall test the complete system through multiple open/close cycles and make all adjustments necessary for proper operation. Smooth manual operation. Full opening and closing. ii . Center sleeve engagement. Locking operation. Gate alignment. Concertina-wire clearance. iii. Overall security. The completed system shall operate smoothly, lock securely, and maintain existing perimeter security. iv. Final acceptance shall require completion of all work, testing, adjustments, cleanup, and required ACSO/GSA-BMD approval. o. Existing Gate Removal/Cleanup i . After the new system has been tested , secured, and accepted, contractor shall remove and dispose of the existing gates and associated components designated for removal ii . Repair contractor-caused damage and restore disturbed concrete, asphalt, fencing, and surrounding areas. Remove all construction debris and equipment. iii. Leave the facility clean , secure , safe, and fully operational each day of construction.
Post-Bid
$75,000.00
Public - County
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 3, 2026
February 23, 2027
5325 Broder Blvd, Dublin, CA
Related To This Project
Dublin, CA
Bid Date: Sep 30 2026
Dublin, CA
Bid Date: Sep 30 2026
Dublin, CA
--
Dublin, CA
--
Dublin, CA
Bid Date: Nov 10 2026
Dublin, CA
--
Dublin, CA
Bid Date: Dec 08 2026
Dublin, CA
--
Dublin, CA
--
Dublin, CA
--
Dublin, CA
--
Dublin, CA
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed