Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 24, 2026 at 8:00 PM

Updated September 29, 2026

Site work and renovation of a water / sewer project in Beaufort, South Carolina. Completed plans call for the renovation of a water / sewer project.

Replacement of seven floating dock segments, each eight feet wide by twenty feet long, at the Broad River Boat Landing while retaining existing concrete piles. The contractor shall provide all labor, materials, equipment, and services necessary to complete the following: The contractor will furnish all general conditions required for the execution of the project, including supervision, site coordination, and compliance with applicable regulations. The contractor will mobilize all personnel, equipment, and resources to the project site at the start of work and fully demobilize upon completion, leaving the site in acceptable condition. The contractor will demolish and remove all existing floating dock segments, totaling seven (7) units, and will dispose of all materials in accordance with local regulations. The contractor will install four (4) aluminum floating dock segments measuring 20 feet by 8 feet. Each segment will include aluminum pontoons, interior pile guides equipped with HDPE pile guide rollers, and ground-out protection. The contractor will install three (3) aluminum floating dock segments measuring 20 feet by 8 feet. These segments will include interior pile guides with HDPE rollers, aluminum pontoons, and aluminum cleats placed at strategic intervals along the dock edges. All questions must be submitted through the Procurement Portal no later than 5:00 pm on Wednesday, September 16, 2026. Broad River Boat Landing is a public access amenity managed by Beaufort County and is located at 1050 Robert Smalls Parkway, Beaufort, SC 29906. The facility consists of an approximately 140 ft long by 8 ft wide L-shaped floating courtesy dock and an approximately 32 ft wide, two-lane concrete boat ramp with a concrete approach . The floating courtesy dock consists of (7) aluminum framed dock segments with aluminum decking. The courtesy dock is supported by ( 10) internally guided 14 in . square concrete piles. The shoreline adjacent to the facility is protected by riprap. For reporting purposes, dock segments are labeled numerically, and piles are labeled alphabetically in accordance with the inspection plan. Please refer to the Photograph Log and the inspection plan included for typical views of the structure and additional information. Estimate start date is early 2027, dependent on committee/council approval. Please see instructions to bidders which provides time to complete

Award

$197,500.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
58
Bidding Soon
841
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2026

October 23, 2026

Project location map

To Be Determined, Beaufort, SC

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed