BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 25, 2026 at 8:00 PM

Updated September 14, 2026

Demolition, site work and new construction of an educational facility in Las Vegas, Nevada. Completed plans call for the construction of a 227,000-square-foot educational facility; for the demolition of a educational facility; and for site work for a educational facility.

he Clark County School District, Contract Procurement and Compliance Services Dept., is soliciting Request for Proposals from firms for Construction Manager at Risk (CMAR) services for: Chaparral High School School Replacement 3850 Annie Oakley Drive Las Vegas, Nevada 89121 The work consists of an approximately 165,000 square feet of new construction, with an overall gross building area of approximately 227,000 square feet. Construction is anticipated to be phased as follows: Phase One - Partial site demolition and utility preparations, Phase Two - Construction in single phase of all new building structures and Phase Three - Demolition of existing high school and site improvements and construction of new site improvements. The existing athletic fields and athletic fields structures will remain in place. All general contractors must be pre-qualified with the Clark County School District and possess a Certificate of Eligibility from the Nevada State Contractors Board prior to submitting the Request for Qualification. The CMAR will provide the required pre-construction and construction services. Preconstruction services shall include assisting the design team with constructability matters, construction cost, value engineering, fast track options and scheduling. The construction services shall include determining a Guaranteed Maximum Price (GMP), procurement of all subcontractor contracts, and managing construction of the project. Selection Criteria and weighted values: General - pass/fail, Applicant organization, workload and past performance (20%), Designated Project Manager and Superintendent experience on CMAR and Design Build with similar size and scope (20%), Project Management Plan (30%), Subcontractors and Safety Program (25%), Certificate of Eligibility for preference (5%). The anticipated CMAR Phases will be Preconstruction Phase Services, December 18, 2026 - November 19, 2027 and Construction Services, July 26, 2027 - May 30, 2029. The Clark County School District invites all businesses, which includes women-owned, minority-owned, and disadvantaged business enterprise companies to participate. The Clark County School District is an equal opportunity employer and will not knowingly discriminate in any area of employment.

Post-Bid

$182,000,000.00

Public - County

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
39
Bidding Soon
516
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2026

December 18, 2026

Project location map

3850 Annie Oakley Dr, Las Vegas, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.