Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 28, 2026 at 8:00 PM
Updated October 4, 2026
Demolition for an educational facility in Pasadena, California. Working plans call for the demolition of a educational facility.
As per WS Bid is cancelled Demolition of the WBuilding at Pasadena City College. Master Agreement No. B240247 Question Deadline Sep 08, 2026 at 10:00 AM Online Q&A Site Walkthrough 09/01/2026 at 10:00 AM PT The Work of the Contract consists of furnishing all labor, supervision, materials, equipment, tools, transportation, permits, temporary facilities, and incidentals necessary to complete the W-Building Demolition Project, including utility coordination, unforeseen hazardous materials abatement, furniture and equipment removal, interior soft demolition, complete building demolition, debris removal and disposal, site restoration, temporary safety measures, and project closeout, in accordance with the Contract Documents. In addition, to be included but not limited to: 1. Prepare and submit demolition, logistics, traffic-control , safety, dust-control, waste-management, shoring, and bridge-removal plans. 2. Verify existing site conditions and document the condition of the R Building, sidewalks, roadways, utility tunnel, landscaping, service yard, pool area, and other improvements designated to remain. 3. Install and maintain an 8 -foot-high temporary chain-link construction fence with green screen, lockable gates, barricades, warning signs, and site security. 4. Maintain safe pedestrian routes, building exits, fire lanes, emergency access, and accessible paths throughout the work. 5. Confirm before structural demolition that all utilities have been removed from the W Building and that no active utilities remain within the building demolition limits . 6. Completely demolish and remove the W Building, including the structure, roof, exterior and interior components, slabs, foundations, footings, pads, stairs, ramps, and associated improvements within the approved demolition limits. 7. Demolish the connecting bridge between the W Building and R Building using an engineered sequence, including temporary shoring, bracing, lifting, rigging, and structural separation. 8. Protect the R Building during bridge demolition and provide temporary dust-tight, secure, and weather-resistant protection at the bridge connection. 9. Furnish and install the required railing at the R Building side following bridge removal, in accordance with the approved drawings and specifications. 10. Protect the existing utility tunnel, adjacent utilities, south sidewalk, roadways, landscaping, service yard, pool area, and other improvements designated to remain. 11. Provide engineered shoring and excavation protection for foundation removal, including the elevation difference between the north and south sides of the W Building. 12. Control dust, noise, vibration, debris, stormwater, and equipment operations throughout demolition. 13. Provide flaggers and traffic control during truck access, debris loading, and hauling. 14. Recycle and legally dispose of all demolition debris and provide disposal manifests, weight tickets, and recycling records. 15. Backfill and compact excavations with approved material, provide positive drainage, and complete the required temporary site restoration. 16. Repair damage caused by demolition, equipment, trucking, or failure to provide proper protection. 17. Submit daily reports, progress photographs , inspection records, compaction reports, disposal documentation, as -built information, and required closeout documents. 18. Remove temporary facilities and leave the site clean, secure, safe, and ready for the next phase of construction.
Final Planning
$300,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 28, 2026
March 26, 2027
1570 E Colorado Blvd, Pasadena, CA
Related To This Project
Pasadena, CA
Bid Date: Sep 21 2026
Pasadena, CA
Bid Date: Sep 21 2026
Pasadena, CA
Bid Date: Sep 16 2026
Pasadena, CA
Bid Date: Sep 11 2026
Pasadena, CA
Bid Date: Nov 16 2026
Pasadena, CA
Bid Date: Oct 14 2026
Pasadena, CA
Bid Date: Oct 01 2026
Pasadena, CA
Bid Date: Sep 07 2026
Pasadena, CA
Bid Date: Sep 14 2026
Pasadena, CA
Bid Date: Sep 02 2026
Pasadena, CA
Bid Date: Sep 02 2026
Pasadena, CA
--
Pasadena, CA
Bid Date: Aug 25 2026
Pasadena, CA
Bid Date: Aug 24 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed