Site work and new construction of a water / sewer project in Johnstown, Ohio. Completed plans call for the construction of a water / sewer project.
Question Deadline 09/10/2026 For information and questions concerning the proposed Work, contact Laurissa Hoyle, PE, telephone: 919-270-2589, or email Laurissa.Hoyle@jacobs.com. The Project contemplated consists of expansion and upgrade of the Johnstown Wastewater Treatment Plant (WWTP) to 2.4 MGD including but not limited to: furnish and installing new Headworks Facility; new Influent Pump Station with new influent flow meter valve value; retrofit and upgrade of the existing Aerobic Granular Sludge Basins (AGS 1 and 2), new Aerobic Granular Sludge Basins (AGS 3 and 4), where each basin shall utilize AquaAerobic Systems Inc.'s AquaNereda granular sludge system and all appurtenances; new Blower Building with seven (7) positive displacement blowers; new Ultraviolet Disinfection facility with integrated cascade aeration facility, pre- UV flow meter and valve vault, and new effluent outfall to Raccoon Creek; new WAS Thickening Facility with two (2) rotary drum thickeners ; retrofit and upgrade of the existing aerobic digesters with new aeration equipment and cover system; retrofit and upgrade of the existing Dewatering equipment including installation of two new Fournier dewatering press cassettes ; new full-plant main power feeder with transformer, full-plant backup generator, and new Main Electrical room with full-plant switch gear and motor control centers; new piping, conduit and wire to support new facilities; and demolition of existing buildings including existing influent pump station, blower facility (including old sand filter basement), existing ultraviolet disinfection facilities, existing post-aeration facilities, and so forth. Project shall include provisions for maintaining the process and flow during construction via bypass pumping, temporary piping, and temporary equalization tank. The Work will be completed in all
GC Bidding
$70,000,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 8, 2026
December 7, 2026
Multiple Locations, Johnstown, OH
Related To This Project
Johnstown, OH
Bid Date: Sep 29 2026
Johnstown, OH
--
Johnstown, OH
--
Johnstown, OH
--
Johnstown, OH
Bid Date: Jul 14 2026
Johnstown, OH
--
Johnstown, OH
--
Johnstown, OH
Bid Date: May 04 2026
Johnstown, OH
--
Johnstown, OH
Bid Date: Apr 09 2026
Johnstown, OH
Bid Date: Feb 09 2026
Johnstown, OH
Bid Date: Sep 26 2025
Johnstown, OH
--
Johnstown, OH
--
Johnstown, OH
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.