BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 18, 2026 at 8:00 PM

Updated September 20, 2026

Site work and new construction of a playground / park / athletic field in Allentown, Pennsylvania. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Construction of a shared use path section of the MLK Trail between Fountain Park and Lehigh Parkway East. Bonds: Bid Bond required (unspecified amount). Question Deadline 09/11/2026 at 4:00 PM ET Submit All Questions online. CLEARING AND GRUBBING Per PennDOT Publication 408 Section 201 and as shown on the construction plans. This item includes the trimming of any trees and tree branches within a horizontal distance of 8'-0" from the centerline of the proposed path and 12'-0" vertical distance above the path and any branches that present a hazardous condition at the direction of the City's Representative. This item includes the removal of any trees in conflict with the proposed parking lot. This item includes root pruning in according with the Root Pruning detail on the construction plans. This item includes the removal and stockpiling of the top 8" of topsoil . This item includes the removal and disposal of any existing railroad ties. This item includes the removal of existing ballast, as needed, for path and shoulder construction. This item includes the partial removal of existing guide rail at STA 67+ 80 LT. Protection of existing street trees and publicly owned trees is included in this item. Refer to the Biodegradable Tree Shelter Detail on the plans for additional guidance. All labor and material and costs associated with these items are incidental to this item and cost. PAVED SHARED-USE PATH Per PennDOT Pub 408 Sections 203, 212, 313, 350, 413, and 460. Provide material and install the proposed path as shown on the construction plans. This includes the proposed landing and rest areas, parking lot connections, outlets, and stub connections. This includes the installation of the asphalt sidewalk section adjacent to South 10th Street. All excavation, grading, subgrade preparation, geotextile, stone, and pavement material is incidental to this item and cost. PAVED PARKING LOT Per PennDOT Pub 408 Sections 203, 212, 313, 350, 413, and 460. Provide material and install the proposed parking lot adjacent to Lehigh Parkway East as shown on the construction plans. All excavation, subgrade preparation, geotextile, grading, stone, and pavement material is incidental to this item and cost. PARKING LOT TIRE STOPS Provide and install double-sided precast concrete tire stops measuring 6' long x 9" wide x 5" high as shown on the construction plans. Submit catalog cut to the City's Representative for approval prior to ordering. CONCRETE CURB Per PennDOT Publication 408 Section 630, except as revised, and as shown on the construction plans. This item also includes the removal of existing curb, as necessary, and pavement restoration. MATERIAL Revise to meet City of Allentown Bureau of Engineering standards and specifications, including the use of Class AA cement concrete. Revise to delete: o Class A cement concrete, Section 704 oClass A cement concrete, Section 704, except with maximum slump of 1.5" Revise to add: . Class AA cement concrete, Section 704 oClass AA cement concrete, Section 704, except with maximum slump of 1.5" Subbase (No. 2A) - Section 350 . BCBC Base Course ID-2 Wearing Course o AC-20 Joint Sealer o Bituminous Tack Coat REPLACE AND RESET MANHOLE SET Per PennDOT Publication 408 Sections 605 and 606 and as shown on the construction plans. Reset the manhole sets at STA 100 +85 RT and STA 14 +33 RT in and adjacent to the proposed parking lot to finished grade, if feasible. If necessary, replace the manhole sets to finished grade. MLK TRAIL PHASE 1 CONSTRUCTION Install new wood guide rail along the parking lot and reset wood guide rail as shown on the construction plan. This item includes all material and labor for the new wood guide rail installation and resetting of the existing wood guide rail including lumber, bolts , stone, and concrete.

GC Bidding

$900,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
875
Active Projects
355
Bidding Soon
5,791
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2026

October 28, 2026

Project location map

910 Martin Luther King Jr Dr, Allentown, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.