Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 11, 2026 at 7:00 PM

Updated November 17, 2026

Site work and new construction of a multi-residential development in El Paso, Texas. Completed plans call for the construction of a multi-residential development; and for site work for a multi-residential development.

Construction of the Eastside Crossings IIB apartment complex. Question Deadline 09/10/2026 at 4:00 PM MT Any questions regarding the CSP may be directed to Ms. Melissa Moreno at (915) 849-3724 or at mmoreno@ephome.org. The project consists of the construction of 74 apartment Units in 4 buildings on a 1.76 acre vacant lots located at 2055 N. Zaragoza Road, El Paso, Texas 79938. The 74 apartment units are divided into two separate drawings sets, one for each site. Part A includes 41 units in 2 buildings, and part B includes 33 units in 2 buildings. Apartment buildings are concrete slab on grade with 2x lumber framing with exterior cement board shiplap, panels with horizontal batten, stone veneer, stucco finishes and asphalt shingle roofing, and Mechanical , Plumbing, Electrical (MPE) systems . Also, including new site work, streets, parking, utilities, and landscaping / irrigation. Interior finishes painted drywall , LVT flooring throughout with ceramic tile in bathrooms. The project also includes playground areas, and other site amenities. Five percent (5%) of the units are ADA accessible, and two percent (2%) are audio-visual impaired compliant. Plus all applicable HUD, Section 504, Fair Housing Act and local requirements. The Work of the Project is defined by the Contract Documents and consists of the following: Site: Grading and drainage including asphalt driveways and parking lots with striping, concrete curb and gutters, sidewalks, dumpsters enclosures, landscaping and irrigation, site furnishing, fencing, playground, site power distribution and lighting, water and sewer services, and fire lanes. Buildings: Buildings are post tension slab on grade turned down footings with wood stud structure and prefabricated floor and roof trusses. Exterior includes shingle roofing, cement lap siding, cement stucco, manufactured rock veneer and exterior metal stairs. Interiors include gypsum board painted with orange peel texture, LVT and ceramic tile flooring, Casework, toilet and bath accessories , window treatments, doors and frames, wire Shelving, plumbing, electrical and mechanical fixtures/equipment/trim. HVAC systems are electric packaged vertical heat pump for units and community center is VRF system with mini cassettes. Fire Sprinkler to include design and installation by a licensed fire protection sprinkler installer. Construction duration is estimated at 14 months from Notice to Proceed Solicition No- 260330, 251247

Post-Bid

$3,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
25
Bidding Soon
411
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2026

January 4, 2027

Project location map

2055 N Zaragoza Rd, El Paso, TX

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed