Site work and new construction of a pre-engineered storage facility in Arcadia, Florida. Completed plans call for the construction of a 3,600-square-foot, one-story above grade pre-engineered storage facility; and for site work for a pre-engineered storage facility.

1.The contractor shall purchase and install one (1 ) new pre-fabricated metal building (pole barn ) with roof. Shop drawings shall be provided and approved by the DeSoto County Board of County Commissioners before manufacturing begins. The building shall comply with all State, Federal, and local laws and ordinances. 2.The building system shall include but not limited to: structural steel system , metal roof system, and all trim and accessories as required and foundation design and installation. 3. The intended use of this building is to act as a cover or awning over equipment, trailers, and vehicles to limit their exposure to the elements. 4. The successful Contractor shall be responsible for providing all required engineered drawings and specifications required to obtain the appropriate building permits. Electrical improvements will not be needed. Question Deadline 08/28/2026 at 2:00 PM ET All questions should be submitted electronically, Questions may be submitted by email to c.talamantez@desotobocc.com.m Supply and installation of one pre-engineered, pre-fabricated metal pole barn (50'L x 72'W x 14'H) including structural steel system, 26-gauge metal roof system, all trim, accessories, and post foundation footings. Two (2) single slope ridge frames, clear span. 3. No electricity is needed to the building. 4. Wind load requirement is 140 MPH (mile per hour) and shall meet FBC (Florida Building Code) latest edition. 5. Roof shall be 26 Gauge Galvalume Plus. Trim for the Wall , Roof, and Jamb shall be Galvalume Plus. No insulation is required for roof. 6. No slab is required ; only foundations/footings shall be installed as required for the support framing. 7.Contractor responsible for the pad prior to installation. 8. All screws must contain an integral rubber washer. 9. The roof pitch shall be designed as single slope with no gutters and downspouts ensuring any runoff are directed away from the building. Roof metal shall be a minimum 26 gauge metal. 10. Roof and Trim color will be chosen once bidder has been selected and the steel structure will be standard red iron. 11. Concrete for installation of 10" posts are the responsibility of the Contractor. 12. Freight charges must be included in the proposal . Delivery will be to the Northside of the Turner Center property located at 2250 NE Roan Street, Arcadia, FL 34266. The metal building must comply with all State, Federal, and local laws and ordinances. Question Deadline 08/28/2026 at 2:00 PM ET

Post-Bid

$30,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
361
Active Projects
157
Bidding Soon
2,046
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

October 1, 2026

Project location map

2250 NE Roan Street, Arcadia, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.