Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 24, 2026 at 8:00 PM
Updated September 27, 2026
Site work for a water / sewer project in Colorado City, Texas. Completed plans call for site work for a water / sewer project.
Construction of a new Pump Station Building, installation of vertical turbine pumps and electrical equipment, installation of new yard piping, construction of a new 2.0 MG GST, and various demolition work. The project includes the installation of a new pump station facility that will include an engineered metal building with a bridge crane within the pump room, an electrical room, as well as a new restroom and necessary ADA facilities. The pump station will be designed as a 2+1 pump operation to deliver up to 23 MGD. The project also includes a two-million gallon ground storage tank and the procurement of electrical substation equipment. 1. Existing Spade Pump Station ñ The existing pump station is a critical booster pump station to the overall operation of the Lake EV Spence Raw Water Transmission System. Prior to the temporary or permanent shutdown of the facility, Contractor must contact CRMWD at least 2 weeks prior to the proposed shutdown date. 2. Existing Spade Electrical Substation ñ The existing electrical substation is required for the operation of the Spade Pump Station. Shutdowns of the electrical substation should be coordinated with shutdowns of the existing Spade Pump Station. Prior to the temporary or permanent shutdown of the facility, Contractor must contact CRMWD at least 2 weeks prior to the proposed shutdown date. 3. Connections to existing 42î Transmission Line ñ To make the required connections, shutdowns of the existing transmission line will be required. Shutdowns should be coordinated with CRMWD operations and other facility shutdowns. Prior to the temporary or permanent shutdown of the facility, Contractor must contact CRMWD at least 2 weeks prior to the proposed shutdown date. Question Deadline 09/17/2026 at 2:00 PM CT Final day for questions on the online. The Ownerís Budget for the Project is $22,000,000.
GC Bidding
$22,000,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2026
November 30, 2026
150 East 1st Street, Colorado City, TX
Related To This Project
Colorado City, TX
Bid Date: Oct 14 2026
Colorado City, TX
--
Colorado City, TX
Bid Date: Apr 27 2026
Colorado City, TX
Bid Date: Apr 08 2026
Colorado City, TX
Bid Date: Sep 08 2025
Colorado City, TX
Bid Date: Oct 08 2020
Colorado City, TX
Bid Date: Jul 17 2025
Colorado City, TX
Bid Date: Jun 05 2025
Colorado City, TX
Bid Date: Mar 25 2025
Colorado City, TX
Bid Date: Jul 29 2025
Colorado City, TX
Bid Date: Jan 08 2025
Colorado City, TX
Bid Date: Nov 07 2024
Colorado City, TX
Bid Date: Nov 07 2024
Colorado City, TX
Bid Date: May 07 2024
Colorado City, TX
Bid Date: Feb 20 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
