BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 24, 2026 at 8:00 PM

Updated September 27, 2026

Site work for a water / sewer project in Colorado City, Texas. Completed plans call for site work for a water / sewer project.

Construction of a new Pump Station Building, installation of vertical turbine pumps and electrical equipment, installation of new yard piping, construction of a new 2.0 MG GST, and various demolition work. The project includes the installation of a new pump station facility that will include an engineered metal building with a bridge crane within the pump room, an electrical room, as well as a new restroom and necessary ADA facilities. The pump station will be designed as a 2+1 pump operation to deliver up to 23 MGD. The project also includes a two-million gallon ground storage tank and the procurement of electrical substation equipment. 1. Existing Spade Pump Station ñ The existing pump station is a critical booster pump station to the overall operation of the Lake EV Spence Raw Water Transmission System. Prior to the temporary or permanent shutdown of the facility, Contractor must contact CRMWD at least 2 weeks prior to the proposed shutdown date. 2. Existing Spade Electrical Substation ñ The existing electrical substation is required for the operation of the Spade Pump Station. Shutdowns of the electrical substation should be coordinated with shutdowns of the existing Spade Pump Station. Prior to the temporary or permanent shutdown of the facility, Contractor must contact CRMWD at least 2 weeks prior to the proposed shutdown date. 3. Connections to existing 42î Transmission Line ñ To make the required connections, shutdowns of the existing transmission line will be required. Shutdowns should be coordinated with CRMWD operations and other facility shutdowns. Prior to the temporary or permanent shutdown of the facility, Contractor must contact CRMWD at least 2 weeks prior to the proposed shutdown date. Question Deadline 09/17/2026 at 2:00 PM CT Final day for questions on the online. The Ownerís Budget for the Project is $22,000,000.

GC Bidding

$22,000,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
18
Bidding Soon
318
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2026

November 30, 2026

Project location map

150 East 1st Street, Colorado City, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.