Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 9, 2026 at 8:00 PM
Updated September 12, 2026
Site work and new construction of a religious / funeral development in Elk City, Oklahoma. Completed plans call for the construction of a religious / funeral development; and for site work for a religious / funeral development.
Base Bid - Asphalt Roadways with 6" concrete curb Alternate Bid - Concrete Roadways with 6" concrete curb If obtaining a hard copy set, please notify WDB Engineering, PLLC at least 24 hours prior to picking up the hard copy set. Hard copy sets may be mailed to the bidder ONLY if the bidder provides a FedEx or UPS account number to the sender, WDB Engineering, PLLC. Refunds will not be made. PRIME BIDDER MUST BE LISTED ON THE QUESTCDN PLAN HOLDER LIST, OTHERWISE THE BID PROPOSAL WILL BE REJECTED. Each bidder MUST purchase plans from Quest CDN or WDB Engineering, PLLC and appear on the official plan holder's list. ANY BID RECEIVED BY A BIDDER NOT APPEARING ON THE OFFICIAL PLANHOLDER'S LIST WILL BE REJECTED WITHOUT BEING READ. The Owner reserves the right to waive any informalities or to reject any or all bids. Each bid must be submitted in a sealed envelope bearing on the outside the name of the bidder, his address, and the name of the project for which the bid is submitted. No bid will be accepted more than 72 hours prior to the scheduled bid opening. If forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as specified in the bid form. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. Time of Completion and Liquidation Damages Bidder must agree to commence work on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete the work within 180 consecutive calendar days thereafter. The information for Bidders, Form of Bid, Form of Contract, Specifications, and Form of Bid Bond, Performance and Payment Bond, and other contract documents may be examined at the following: WDB Engineering PLLC 6330 S.E. 74TH Street Oklahoma City, OK 73135
GC Bidding
$1,000,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 29, 2026
October 29, 2026
320 W 3rd St, Elk City, OK
Related To This Project
Elk City, OK
Bid Date: Oct 06 2026
Elk City, OK
Bid Date: Sep 14 2026
Elk City, OK
--
Elk City, OK
Bid Date: May 20 2026
Elk City, OK
Bid Date: May 14 2026
Elk City, OK
Bid Date: Mar 04 2026
Elk City, OK
Bid Date: Feb 17 2026
Elk City, OK
Bid Date: Feb 17 2026
Elk City, OK
Bid Date: Jan 30 2026
Elk City, OK
Bid Date: Jan 30 2026
Elk City, OK
Bid Date: Jan 14 2026
Elk City, OK
Bid Date: Dec 24 2025
Elk City, OK
Bid Date: Sep 30 2025
Elk City, OK
Bid Date: Sep 30 2025
Elk City, OK
Bid Date: Oct 29 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
