Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 6, 2026 at 7:00 PM

Updated November 12, 2026

Renovation of a municipal facility in Columbia, Missouri. Completed plans call for the renovation of a municipal facility.

Replace metal roof. CONSTRUCTION ESTIMATE $ 2,079,900 - $ 2,311,000 Questions regarding the scope of work and commercial conditions should be directed to Design Services Project Manager Mark Hoerstkamp at (573) 882-2957 or hoerstkampm@missouri.edu. SCOPE OF WORK The Contractor shall furnish all labor, materials, tools, equipment necessary for, and incidental to, construction of this project as indicated on the Drawings and specified herein. Work shall include everything requisite and necessary to finish work properly, notwithstanding that every item of labor or materials or accessories required to make project complete may not be specifically mentioned. General Description of Work: Project consists of removal of existing roofing and installation of new roofing system at : Clydesdale Hall as indicated on the Drawings and Specifications. Demolition shall consist of removal of roofing system down to the steel deck on Clydesdale Hall as indicated on the Drawings and Specifications. Architectural work shall consist of a new metal roofing assembly installed consisting of 3 inches of polyisocyanurate insulation, a mechanically fastened -inch high-density polyisocyanurate cover board, a self-adhered vapor barrier membrane, and a new standing seam Zee- Lock metal roof system. The new work includes all required accessories, including gutters, rake edge and drip fascia, ridge caps, flashings at penetrations and equipment curbs, a complete snow retention system, gutter guards, and replacement metal siding panels at dormers as required to match the new roofing system. The completed installation shall be performed in accordance with the roofing manufacturer's requirements to qualify for a 20-year No Dollar Limit (NDL) Full System Warranty, ensuring long-term weather protection and system performance. Snow guard installation shall be provided in accordance with Section 07 7253, Snow Guard as indicated on the Drawings and Specifications Question Deadline 12/01/2026 Any request for interpretation shall be delivered to the Architect at least one (1) week prior to time for receipt of bids

Sub-Bidding

$2,311,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
29
Bidding Soon
681
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2026

April 19, 2027

Project location map

900 E Campus Dr, Columbia, MO

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed