BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 8, 2026 at 8:00 PM

Updated September 9, 2026

Site work and renovation of a water / sewer project in Santa Monica, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Rehabilitation of the Moss Avenue Pump Station. Question Submission Deadline:September 4, 2026, 3:00pm Requests for clarifications must be entered into OpenGov thru the "Question and Answer" tab . Project Summary 1. The Project is generally described as the rehabilitation of the existing Moss Avenue Pump Station (MAPS) facility, including the installation of a new backup engine driven pump, structural repairs to improve watertightness, electrical equipment upgrades, and construction of a new operations control room. The Work includes labor, material and equipment, services required for construction, testing, and commissioning of the Project in accordance with the Contract Documents and as more specifically described in the Specifications and Drawings and includes, but is not limited to, the following principal features. a. Pump station interior concrete spalling and rebar repairs. b. Pump station ground level cleaning and protective sealant application. Construction of a new control room container building, including fire protection and alarm systems design and installation Installation of new diesel engine-powered backup pump and associated above ground diesel fuel tank and fuel piping. Installation of new landing platform in pump room. f. Electrical room modifications, including access hatch enlargement and new equipment pads. g. Replacement of major power distribution equipment including the main service switchboard, motor control center and automatic transfer switch including consolidation of a switchboard and panelboard. h. The installation of the new control room container building required relocation of the service feeders which required the main service switchboard to be located at grade level. Provisions for a portable generator connection are provided at the main service switchboard. j. Replacement of power and control wiring. k. The addition of a large UPS system to provide additional standby power to the supply and exhaust fans in the pump room. 1. Instrumentation and Control Work; and m. All material and equipment, construction and services inherent to the Work.

GC Bidding

$7,368,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
600
Active Projects
208
Bidding Soon
3,637
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2026

November 16, 2026

Project location map

1625 Appian Wy, Santa Monica, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.