Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 28, 2026 at 8:00 PM
Updated September 3, 2026
Renovation of a municipal facility in Camden, South Carolina. Completed plans call for the renovation of a municipal facility.
The Work consist of the renovation of an existing office building with associated training and emergency operations areas. Existing building to be renovated to include primarily office spaces. Renovations of an existing single story office building in Camden, SC for Kershaw Co Emergency Services. The building is approximately 11,640 SF Exterior and Interior Renovations Scope of work includes Selective Demolition, Concrete patching, Steel Ladder, Wood frame Wall and GWB systems, Plywood Mechanical Mezz in attic, Millwork and wood casework, Roofing, EIFS & Stucco; HM Frames & doors, Wood Doors, Tiling, ACT, LVT, CPT, Interior and Exterior Painting, Toilet Partitions and Accessories, Alum Canopies, Plumbing, Mechanical and Electrical including Generator/ATS. Add Alternates Include: Alt-1: Remove Exterior Corner Quoins and replace with matching EIFS, painted. Alt-2: Replace Exterior Storefront Doors and new Hardware Alt-3: Replace existing asphalt shingle roofing with new Standing Seam Metal Roofing Alt-4: Provide Tile Shower Floor & Walls in lieu of fiberglass insert as specified. Question Deadline 09/03/2026 at 3:00 PM ET All questions And Substitution Requests must be sent directly to the estimator via email at mike.illes@fbiconstruction.com All work shall be substantially completed (as evidenced by the date on the Certificate of Substantial Completion) within: Two Hundred and Ten Days ------------------------------------------------- (210) CALENDAR DAYS from the DATE OF COMMENCEMENT set forth in the Notice to Proceed or Contract, subject to adjustments as provided in the Contract Documents. The undersigned further agrees that from the compensation to be paid, the owner shall retain as Liquidated Damages, for each calendar day the actual construction time to achieve SUBSTANTIAL COMPLETION exceeds the specified or adjusted Contract Time for SUBSTANTIAL COMPLETION, the sum of five hundred dollars ($500.00) per day.
GC Bidding
$400,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 17, 2026
October 19, 2026
124 State Rd S-28-194, Camden, SC
Related To This Project
Camden, SC
Bid Date: Sep 30 2026
Camden, SC
Bid Date: Sep 30 2026
Camden, SC
Bid Date: Sep 21 2026
Camden, SC
Bid Date: Sep 10 2026
Camden, SC
--
Camden, SC
Bid Date: Jun 18 2026
Camden, SC
Bid Date: Jun 25 2026
Camden, SC
--
Camden, SC
Bid Date: Jun 29 2026
Camden, SC
Bid Date: Jun 10 2026
Camden, SC
Bid Date: Jun 02 2026
Camden, SC
Bid Date: May 28 2026
Camden, SC
Bid Date: May 12 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
