Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 25, 2026 at 8:00 PM

Updated August 30, 2026

Site work and new construction of a library in New Tecumseth, Ontario. Conceptual plans call for the construction of a 23,000-square-foot library.

Replacement of Memorial Branch in Alliston with a new larger space (approximately 23,000 sq ft). TIMELINE: Project is preliminary. Project development timelines are undetermined. Further update in winter/spring, 2027.

Conceptual

$8,000,000.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
489
Active Projects
240
Bidding Soon
3,694
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2029

Project location map

17 Victoria St E, New Tecumseth, ON

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed