BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 2, 2026 at 8:00 PM

Updated September 3, 2026

Site work and new construction of a water / sewer project in Perris, California. Completed plans call for the construction of a water / sewer project.

Online Q&A Yes Q&A Deadline 09/09/2026 5:00 PM (PDT) All questions must be submitted through online. The work to be constructed primarily consists of three separate pressurized potable water pipelines, and their connections to existing pipelines: the Matthews Pipeline, the Watson Pipeline, and the Romoland Feeder Extension. The Matthews Pipeline extends from the southern side of the intersection of Antelope Road and Ethanac Road northward to the future Antelope and Watson II Booster Pump Station near the intersection of Antelope Road and Watson Road in the City of Menifee, CA. On this alignment, the Matthews Pipeline crosses the Metrolink right-of-way and SR-74/Caltrans rightof-way. The southern end of the Matthews Pipeline branches into three smaller pipelines which connect to existing water pipelines along Ethanac Road. The Watson Pipeline extends from the future Antelope and Watson II Booster Pump Station near the intersection of Antelope Road and Watson Road to the existing Watson Road Booster Pump Station site in the City of Menifee, CA. The Romoland Feeder Extension extends from the future Antelope and Watson II Booster Pump Station near the intersection of Antelope Road and Watson Road to the existing Romoland Feeder within Antelope Road. The work comprises construction of approximately 3,000 linear feet of 36-inch diameter welded steel pipe (Matthews Pipeline) and its associated branching pipelines (approximately 300 total linear feet of 30-inch, 20-inch, and 12-inch pipelines); approximately 7,200 linear feet of 30-inch diameter welded steel pipe (Watson Pipeline); and approximately 200 linear feet of 36-inch diameter welded steel pipe (Romoland Feeder Extension). The Matthews Pipeline requires a trenchless crossing of the Metrolink right-of-way and SR-74/Caltrans right-of-way. The Watson Pipeline requires the installation of approximately 210 linear feet of 24-inch diameter welded steel pipe, and relocation of approximately 20 linear feet of 18-inch diameter welded steel pipe, in and near Menifee Road. Estimated Bid Value $18-$21 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

$21,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
673
Active Projects
225
Bidding Soon
4,221
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2026

November 23, 2026

Project location map

Multiple Locations, Perris, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.