BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 2, 2026 at 8:00 PM

Updated September 3, 2026

Site work and new construction of a water / sewer project in Trempealeau, Wisconsin. Completed plans call for the construction of a water / sewer project.

The work for this project will be performed at the existing Village of Trempealeau Wastewater Treatment Plant (WWTP) located at 23993 Fremont St. All the work will take place inside of the WWTP pole building. This Contract shall include all labor and equipment including general , mechanical , electrical , and instrumentation work. The work includes construction of a new Phosphorus Removal Chemical Feed and Storage System in the WWTP. The Owner's operating personnel will be responsible for operating existing and new facilities in accordance with the construction sequence and schedule. At no time shall the Contractor's personnel, equipment, or material prevent the access by Owner's staff to any item of equipment, piping, wiring, or controls. Bypassing of untreated or partially treated wastewaters to surface waters, storm sewers, or drainage courses will not be permitted during construction. The Contractor shall forward flow to the WWTP located northwest of the station. All existing piping and materials removed and not incorporated into the work will be classified by the Engineer or Owner as either salvage or junk. The Contractor shall clean all salvage of loose debris and store it on the site as required by the Engineer. All salvage shall remain the property of the Owner. The Contractor shall remove all junk from the site. Unless there is a specific bid item, all costs associated with disposal of removed items and materials shall be incidental to the Project. Question Deadline 09/24/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information Davy Engineering Co., 115 6th St. S., La Crosse, Wisconsin 54601. Telephone (608) 782-3130. Questions received less than seven days prior to the date for opening of Bids may not be answered. Construction of chemical feed and storage facilities for the wastewater treatment plant (WWTP) including general and mechanical construction. Bonds: 5% Bid Bond, Certified Check required, Performance Bond required (unspecified amount), Payment Bond required (unspecified amount).

GC Bidding

$175,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
34
Bidding Soon
619
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2026

November 2, 2026

Project location map

23993 Fremont St, Trempealeau, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.