Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 5, 2026 at 8:00 PM
Updated October 11, 2026
Renovation of a power facility in Abilene, Texas. Completed plans call for the renovation of a power facility.
The contractor shall provide all labor, supervision, materials, equipment, tools, and services necessary to replace the Substation Alpha Feeder Protection Relays at Building 11912. The work includes installation and wiring of two (2) new GE 850 Feeder Protection Relays furnished by the Government in accordance with NEC and NETA standards. The contractor shall program the new relays to match the settings of the existing GE 760 relays using settings provided by the Electrical Shop, perform functionality testing without load, and coordinate with the Electrical Shop prior to energizing primary voltage for testing and commissioning. The contractor shall complete commissioning and full-load testing of both relays with representatives from Electrical, Contracting, and R&O present as witnesses. Coordination with the Electrical Shop is required before conducting any power outages necessary for acceptance testing. Location: Building 11912, Dyess Air Force Base, Abilene, TX 79607. QUESTIONS: any questions whether technical or contractual in nature shall be submitted in writing. Questions must be submitted in writing to 2d Lt Robert Albrightson at robert.albrightson@us.af.mil and SrA Jesse Wisowaty at jesse.wisowaty@us.af.mil by Tuesday, 8 September 2026 by 12pm CST.
Post-Bid
$2,700,000.00
Public - Federal
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 18, 2026
November 16, 2026
To Be Determined, Abilene, TX
Related To This Project
Abilene, TX
Bid Date: Sep 08 2026
Abilene, TX
Bid Date: Sep 25 2026
Abilene, TX
Bid Date: Sep 15 2026
Abilene, TX
Bid Date: Oct 15 2026
Abilene, TX
Bid Date: Sep 24 2026
Abilene, TX
Bid Date: Sep 22 2026
Abilene, TX
Bid Date: Oct 02 2026
Abilene, TX
Bid Date: Aug 31 2026
Abilene, TX
--
Abilene, TX
Bid Date: Sep 10 2026
Abilene, TX
Bid Date: Sep 01 2026
Abilene, TX
Bid Date: Sep 01 2026
Abilene, TX
Bid Date: Oct 02 2026
Abilene, TX
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed