Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 27, 2026 at 8:00 PM
Updated September 2, 2026
Site work for a road / highway in Edmonton, Alberta. Completed plans call for site work for a road / highway.
Asphalt Concrete Pavement, Cold Milling and Other Work 33:14 29 Km N of Town of Swan Hills - 9 Km S of Hwy 2 - kilometre 0.000 to 35.000 33:12 Hwy 33:12 - km 19.377 to km 29.429 - kilometre 19.377 to 29.429 Peace Region APPROXIMATE QUANTITIES: HWY 33:14: 5.15 KM Sideslope Improvement 936 M Smooth Wall Steel Pipe - Supply and Install 284 M3 Grouting of Abandoned Culverts 305,538 M2 Cold Milling Asphalt Pavement 82,000 Tonne Asphalt Concrete Pavement 55,450 Tonne Supply of Aggregate - With Option 89.95 KM Milled Rumble Strip 3,075 M Strong Post W-Beam Guardrail - Supply and Install 44 Unit Impact Attenuator (NCHRP 350/MASH 2009 TL-3) - Supply and Install HWY 33:12: 5.15 KM Sideslope Improvement 384 M Smooth Wall Steel Pipe - Supply and Install 115,562 M2 Cold Milling Asphalt Pavement 28,000 Tonne Asphalt Concrete Pavement 55,450 Tonne Supply of Aggregate - With Option 30.05 KM Milled Rumble Strip 1,475 M Strong Post W-Beam Guardrail - Supply and Install 412 Unit Impact Attenuator (NCHRP 350/MASH 2009 TL-3) - Supply and Install Contractor to supply all materials. Interim Completion Date: November 25, 2026 Contract Completion Date: September 1, 2027. Documents can be obtained from https://purchasing.alberta.ca/
GC Bidding
$1,000,000.00
Public - State/Provincial
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2026
October 20, 2026
Multiple Locations, Edmonton, AB
Related To This Project
Edmonton, AB
Bid Date: Sep 09 2026
Edmonton, AB
Bid Date: Aug 26 2029
Edmonton, AB
Bid Date: Sep 23 2026
Edmonton, AB
Bid Date: Sep 22 2026
Edmonton, AB
Bid Date: Sep 22 2026
Edmonton, AB
Bid Date: Oct 13 2026
Edmonton, AB
Bid Date: Sep 18 2026
Edmonton, AB
Bid Date: Sep 18 2026
Edmonton, AB
Bid Date: Sep 09 2026
Edmonton, AB
Bid Date: Sep 10 2026
Edmonton, AB
Bid Date: Oct 01 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
