BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 30, 2026 at 8:00 PM

Updated September 3, 2026

Demolition, site work, new construction and renovation of a road / highway in Wetonka, South Dakota. Completed plans call for the demolition of a road / highway; for the construction of a road / highway; and for the renovation of a road / highway.

Remove and reset the existing Double Tee deck units, remove existing timber abutments, install proposed steel abutments, and perform related structure incidental work including pile driving. Bonds: Bid Bond required (unspecified amount), Performance Bond required (unspecified amount), Payment Bond required (unspecified amount). Question Deadline 09/01/2026 Adam R. Polley, PE (Adam. R.Polley@IMEGCorp.com). Questions received less than seven days prior to the date for opening of Bids may not be answered.

GC Bidding

$2,000,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
11
Bidding Soon
140
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2026

October 23, 2026

Project location map

375th Avenue, Wetonka, SD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.