BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 1, 2026 at 8:00 PM

Updated September 3, 2026

Demolition, site work, new construction and renovation of an industrial development in Denver, Colorado. Completed plans call for the demolition of a industrial development; for the renovation of a 9,500-square-foot industrial development; and for the construction of a industrial development.

Reference Number 0000435110 Metro Water Recovery (Metro) is requesting Statements of Qualifications and Proposals from qualified contractors to serve as the Construction Management At-Risk (CMAR/Contractor) services for North Campus Site Development and Permitting (Project) at Metro's Robert W. Hite Treatment Facility located at 6450 York Street in Denver, Colorado. Demolition of existing Warehouse and Maintenance Shop building men's and women's locker rooms and a portion of the warehouse to construct approximately 9,500 square feet of expanded modern facilities. Facilities: Robert W. Hite Treatment Facility (RWHTF) - 6450 York Street Denver, CO Treats an average of 130 million gallons per day (MGD) Capacity to treat 220 MGD Northern Treatment Plant (NTP) - 51 Baseline Road, Brighton, CO O Treats an average of 12 MGD O Capacity to treat 28.8 MGD METROGRO Farm - Elbert and Arapahoe Counties, CO 52,000 dryland farm and pasture acres Approximately 33,500 dry tons of Class B biosolids are beneficially reused per year Transmission System (Metro owned) 251 miles of interceptors 3 lift stations Odor control facilities, metering facilities, and other associated appurtenances. The CMAR Contract scope is summarized as follows: The Project includes demolishing the existing WMS men's and women's locker rooms and a portion of the warehouse to construct approximately 9,500 square feet of expanded modern facilities. The WMS building houses 85 staff and will remain occupied during construction. The Contractor must coordinate the Work to minimize operational disruptions and provide temporary, functional restroom and shower facilities for staff throughout the Project. Key Project components include the following: Demolition: o Remove existing men's and women's locker, shower and restroom facilities. Demolish one storage closet and a designated section of the existing warehouse. New Construction & Layout Build larger men's and women's locker, shower and restroom facilities that will expand into the existing warehouse. Construct single-user restroom with shower and a dedicated wellness room. Create operational support spaces: laundry room, uniform storage, general storage, janitor closet, and a boot wash station. Core Infrastructure Upgrades o Structural: Execute structural modifications required for new layout. o Mechanical: Revise mechanical ducting and install upgraded air handling systems. o Plumbing: Install new water heaters, complete piping networks, and commercial grade plumbing fixtures. Bonds: 5% Bid Bond, 100% Performance Bond, 100% Payment Bond. Question Acceptance Deadline : 09/15/2026 04:00 PM EDT Response to Requests for Information/Clarification : September 18, 2026 The Project is to be substantially complete and ready for use by November 5, 2027.

GC Bidding

$4,750,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
286
Active Projects
103
Bidding Soon
1,801
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2026

November 18, 2026

Project location map

6450 York St, Denver, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.