Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 3, 2026 at 8:00 PM

Updated October 9, 2026

Site work and renovation of a municipal facility in Elkton, Maryland. Completed plans call for the renovation of a municipal facility; and for site work for a municipal facility.

Modernization of two existing elevators, including hoist way equipment, cars, entrances, controls, wiring, and machine room equipment. Create two new elevator machine rooms in the penthouses and replace major mechanical components. The Cecil County Maryland's Finance Department and Procurement Division is issuing this Invitation for Bid (IFB) to establish a term contract with a Contractor(s) to perform Cecil County Courthouse Elevator Renovation. The County reserves the right to award to multiple vendors at its own discretion and what is considered the County's best value by the Procurement Manager which will be considered final. The project work includes the modernization of the (2) existing elevators located in the 1938 wing and the 1965 wing (the elevator added in 2014 is not part of this scope) and includes the hoistway equipment, cars, entrances, controls, wiring, and machine room equipment. The project will create (2) new rated elevator machine rooms in the penthouse above elevator hoistways. Question Deadline 09/18/2026 at 3:00 PM ET All questions must be submitted using the questions and answers feature via online portal Renovation of the elevator shall be phased . In addition to the Sally Port elevator, one elevator must be kept in service at all times during construction. - Bringing materials on-site and up to the penthouse is the contractor's responsibility and may require off-hour deliveries. Coordination with the County for off-hour deliveries is required at least two weeks in advance. - Interruptions to pedestrian traffic in the parking lot and inside the building need to be minimized. - Signage for the Courthouse to direct people to the available elevator during construction to be provided by the contractor. Coordination for elevator shutdowns to be coordinate with Cecil County at least two weeks in advance. - Any wiring (including low voltage) and running of IT cabling is the contractor's responsibility. Coordination with the County will be required.

Bid Results

$1,143,880.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
866
Active Projects
342
Bidding Soon
4,899
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed