BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 28, 2026 at 8:00 PM

Updated September 3, 2026

This is a service / maintenance or supply contract in Kirkwood, Missouri. Contact the soliciting agency for additional information.

The City of Glendale, Missouri (City) has s€pursd Federal Aid fimding through the Surface Transportation Block Crrant (STBG) Program administered by the East-West Gateway Council of Governments, the Missouri Deparhnent of Transportation (MoDOT), and the Federal Highway Administration (FHWA) for improvements to E. Essex Avenue between N. Sappington Road and Devon Road. The project is identified as E. Essex Avenue Phase 2. The total estimated project cost, including Preliminary Engineering (PE), Right-of-Way (ROW), Construction Engineering (CE), and Construction, is approximately $2.33 million. Construction of the proposed improvements, estimated at Sl.7m, is currently anticipated during calendar year 2030. It is required that your firm be prequalified with MoDOT and listed in MoDOT's Approved Consulant Prequalification List, or your firm will be considered non-compliarf. DBE firms are required to be listed in the MRCC directory to be considered The method of Contractor Selection has not been Determined at this time. MO DOT - RFQ - E. Essex Ave Phase 2 Project

Conceptual

$2,330,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
95
Bidding Soon
1,293
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2027

Project location map

E Essex Ave, Kirkwood, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.