Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 1, 2026 at 8:00 PM

Updated September 16, 2026

Site work and new construction of a fire / police facility in Arkansas City, Kansas. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

Bid Package 01. Work includes: PEMB SUPPLY, PEMB ERECTION The project value represents the total construction cost estimate. All questions shall be furnished in writing via email to: Evan Malloy emalloy@crossland.com or at 316-391-8124 Provide all material to furnish the pre-engineered metal buildings including all metal wall panels, metal roof panels, vinyl wall/roof insulation, faced/unfaced insulation, trims, metal soffits, metal liner panels, and necessary accessories for a complete and weathertight metal building system as shown on the drawings for the PEMB. 2) For steel and metal items not specifically detailed on the drawings, the supplier shall design and supply appropriate products. 3) The pre-engineered metal building shall be designed for the loads shown on these drawings including all code required unbalanced loads. 4) Engineered stamped drawings. 5) All structural steel to be factory primed. 6) PEMB manufacturer to provide templates and anchor bolts to concrete contractor. 7) All associated sheet metal flashing. 8) Provide trim for all exterior/interior HVAC wall openings 9) Provide girts, jam and trim material for exterior walk doors/openings. 10) Provide gutters and down spouts

Post-Bid

$8,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
27
Bidding Soon
718
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2026

November 2, 2026

Project location map

115 S D St, Arkansas City, KS

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed