Site work and renovation of a fire / police facility in Fayetteville, North Carolina. Completed plans call for the renovation of a fire / police facility.

Replacement of existing boiler and pumps at the Sheriff's Training Center, including removal of construction debris and required site maintenance. Scope of work includes: o The Contractor shall furnish all labor, materials, equipment, permits, and supervision necessary to remove and dispose of existing boiler and pump(s ), installation of new hot water boiler and 2 (two) hydronic pumps, tie equipment into existing electrical, piping, and stack, and all manufacturer required pre-operation flushing, equipment testing, and verification of operation. The Contractor shall ensure the removal and proper disposal of existing boiler and pump(s) in accordance with all Federal, State, and/or Local health, safety, and environmental mandates. Include all permits and inspection fees. The Contractor shall secure all required Cumberland County trade and building permits prior to commencing work. The Contractor shall ensure a manufacturer authorized service technician or installer, tests, starts up the new boiler, inspects for any deficiencies, and submits a written report detailing Startup Performance, combustion analysis, site conditions, confirmation and verification of proper manufacturer recommended installation, and clarification of any additional changes needed to the Owner. The Contractor shall ensure that all equipment shall be flushed prior to startup per the requirements of the water treatment company, water utility provider, and equipment manufacturer. Wash-out is not included. Start up shall include combustion analysis that is taken at different firing rates (25%, 50%, 75%, 100%) of the load. The report shall include the O2, CO, Nox, and boiler efficiency as part of the written report submitted to the Owner. The Contractor shall ensure equipment integration into system controls currently installed on site. The Contractor shall ensure the following Commissioning requirements are met a. Fireside Inspection b. Set up fuel train and combustion air system c. Set up operation set points, including integrating outdoor air sensor if required d. Check all safeties for proper operation e. Verify efficiencies across firing range f. Verify burner turndown across firing range The Contractor shall ensure site is cleaned thoroughly, all construction debris and old equipment is removed, and all equipment operating manuals or specification sheets are given to the Owner

Sub-Bidding

$500,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
133
Bidding Soon
1,855
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2026

October 12, 2026

Project location map

4710 Corporation Dr, Fayetteville, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.