Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 2, 2026 at 8:00 PM

Updated September 29, 2026

Demolition, site work and new construction of a sidewalk / parking lot in Cooperstown, New York. Completed plans call for the demolition of a sidewalk / parking lot; and for the construction of a sidewalk / parking lot.

PROJECT DESCRIPTION Removal and replacement of approximately 2,300 linear feet of existing sidewalk and construction of new poured-in-place concrete sidewalks. LOCATION North and south sides of Susquehanna Avenue from Beaver Street to Elm Street. REMOVAL The Contractor shall remove and properly dispose of all existing asphalt, concretesidewalks, underlying gravel base, and all excavated materials necessary to construct the new sidewalks. The Village will not provide a disposal location. The Contractor shall remove only those areas necessary to complete the work and shall protect all adjacent pavement, curbing, utilities, landscaping, and private property from damage. Any damage caused by the Contractor shall be repaired or replaced at no additional cost to the Village. NEW CONCRETE SIDEWALKS Foundation material (NYSDOT Item 4 or approved equivalent) shall be placed on the prepared subgrade and compacted to a minimum thickness of five (5) inches. Sidewalks shall be constructed continuously across existing driveways. Finished elevations shall provide a smooth transition for vehicle access while maintaining ADAcompliant sidewalk grades and cross slopes. Construct new ADA-compliant curb ramps, including concrete curb returns/tapers and cast iron detectable warning surfaces at all required locations.

Post-Bid

$350,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
304
Active Projects
137
Bidding Soon
1,944
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2026

October 23, 2026

Project location map

Susquehanna Ave, Cooperstown, NY

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed