BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 21, 2026 at 8:00 PM

Updated September 26, 2026

This is a service / maintenance or supply contract in Offutt AFB, Nebraska. Contact the soliciting agency for additional information.

Amendment 1: This amendment is to add information about the site visit. The site visit will take place at Building 515, address: 101 55th St BLDG.515 Offutt AFB, NE 68113 Show time is still 9:00 AM. Please take into account possible traffic and security measures when it comes to timing. The base entrance you will go through will be the STRATCOM Gate. The on-site point of contact will be SSgt Eyvind Boyesen, 402-232-2287 Amendment 2: This amendment is to address more questions about the site visit. Q. With my EAL information submitted, should I proceed directly to the STRATCOM Gate for entry, or do I need to report to the Visitor Control Center first A. You will go straight to the gate. You will tell the Security Forces member that you are a contractor here for a site visit at B515 and that there should be an EAL for you. Q. What identification and vehicle documents should I have with me A. A valid state issued drivers license or ID will suffice. Q. Are photographs or video permitted during the site visit for documenting flooring conditions, measurements, transitions, and other estimating details A. The area is a sensitive compartmented information facility (SCIF), so no photographs will be allowed. Q. Are there any restrictions on cell phones, cameras, tablets, or other electronic devices inside Building 515 A. Yes. All electronics will be unallowable for this site visit. Q. If photography or video is permitted, does it require prior approval or need to be limited to specific areas A. Please see prior answer. Q. Once through the gate, should I proceed directly to Building 515, or is there a designated location where the site-visit group will meet A. Yes proceed directly to B515. We will meet there. Remove existing carpet flooring and install new carpet and vinyl in specified areas of building 515. Questions: Questions will be due Sept 14, 2026, at 1100 CDT

Post-Bid

$4,000,000.00

Public - Federal

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
59
Bidding Soon
759
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2026

November 2, 2026

Project location map

To Be Determined, Offutt AFB, NE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.