BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 2, 2026 at 8:00 PM

Updated September 5, 2026

Demolition, site work and addition to a water / sewer project in Saint Cloud, Florida. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

The Southside Water Reclamation Facility (WRF) currently has a rated capacity of 7.6 million gallons per day (MGD) annual average daily flow (AADF). The proposed upgrades for the Southside WRF will improve the overall function, capacity, and reliability of the facility. All work is located at the Toho Water Authority Southside Water Reclamation Facility (WRF) located at 5701 Michigan Ave., Saint Cloud, FL 34772. Dewatering System Expansion: CMAR to provide pre-construction and construction phase services related to a new dewatering facility, centrate lift station , sludge feed pumps, sludge off-loading station, and related civil , mechanical , electrical, and instrumentation and control improvements. Process Control Improvements: CMAR to provide pre-construction and construction phase services related to aeration system upgrades and internal recycle pump upgrades including blower replacement, new blower canopy structure, replacement of diffuser system and associated piping, newprocess control system including sensor probes; air control valves; and air flow meters, internal recycle pump replacement, and related civil ; mechanical; electrical; and instrumentation and control improvements. The successful respondents shall utilize an open book approach to the projects and provide pre-construction services and a Guaranteed Maximum Price (GMP) with full disclosure of actual costs to TOHO for the project. Preconstruction responsibilities include, but are not limited to value engineering, construction cost estimating, constructability reviews, associated meetings and conferences, and open-book GMP development. Additionally, the successful respondents shall provide construction phase services, consisting of, but not limited to, administrative services, procurement, construction management, scheduling, supervision and accepted accounting principles throughout the complete project Questions Due Date: Sep 9th 2026, 5:00 PM EDT

GC Bidding

$300,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
382
Active Projects
162
Bidding Soon
2,186
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2026

November 2, 2026

Project location map

5701 Michigan Ave, Saint Cloud, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.