Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 2, 2026 at 8:00 PM
Updated September 5, 2026
Demolition, site work and addition to a water / sewer project in Saint Cloud, Florida. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.
The Southside Water Reclamation Facility (WRF) currently has a rated capacity of 7.6 million gallons per day (MGD) annual average daily flow (AADF). The proposed upgrades for the Southside WRF will improve the overall function, capacity, and reliability of the facility. All work is located at the Toho Water Authority Southside Water Reclamation Facility (WRF) located at 5701 Michigan Ave., Saint Cloud, FL 34772. Dewatering System Expansion: CMAR to provide pre-construction and construction phase services related to a new dewatering facility, centrate lift station , sludge feed pumps, sludge off-loading station, and related civil , mechanical , electrical, and instrumentation and control improvements. Process Control Improvements: CMAR to provide pre-construction and construction phase services related to aeration system upgrades and internal recycle pump upgrades including blower replacement, new blower canopy structure, replacement of diffuser system and associated piping, newprocess control system including sensor probes; air control valves; and air flow meters, internal recycle pump replacement, and related civil ; mechanical; electrical; and instrumentation and control improvements. The successful respondents shall utilize an open book approach to the projects and provide pre-construction services and a Guaranteed Maximum Price (GMP) with full disclosure of actual costs to TOHO for the project. Preconstruction responsibilities include, but are not limited to value engineering, construction cost estimating, constructability reviews, associated meetings and conferences, and open-book GMP development. Additionally, the successful respondents shall provide construction phase services, consisting of, but not limited to, administrative services, procurement, construction management, scheduling, supervision and accepted accounting principles throughout the complete project Questions Due Date: Sep 9th 2026, 5:00 PM EDT
GC Bidding
$300,000.00
Public - County
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 1, 2026
November 2, 2026
5701 Michigan Ave, Saint Cloud, FL
Related To This Project
Saint Cloud, FL
--
Saint Cloud, FL
--
Saint Cloud, FL
--
Saint Cloud, FL
--
Saint Cloud, FL
--
Saint Cloud, FL
--
Saint Cloud, FL
Bid Date: Aug 04 2026
Saint Cloud, FL
Bid Date: Aug 27 2026
Saint Cloud, FL
Bid Date: Jul 21 2026
Saint Cloud, FL
Bid Date: Jul 23 2026
Saint Cloud, FL
Bid Date: Jul 16 2026
Saint Cloud, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
