Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 1, 2026 at 8:00 PM

Updated October 6, 2026

Demolition, site work and addition to a water / sewer project in Saint Cloud, Florida. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

The Southside Water Reclamation Facility (WRF) currently has a rated capacity of 7.6 million gallons per day (MGD) annual average daily flow (AADF). The proposed upgrades for the Southside WRF will improve the overall function, capacity, and reliability of the facility. All work is located at the Toho Water Authority Southside Water Reclamation Facility (WRF) located at 5701 Michigan Ave., Saint Cloud, FL 34772. Dewatering System Expansion: CMAR to provide pre-construction and construction phase services related to a new dewatering facility, centrate lift station , sludge feed pumps, sludge off-loading station, and related civil , mechanical , electrical, and instrumentation and control improvements. Process Control Improvements: CMAR to provide pre-construction and construction phase services related to aeration system upgrades and internal recycle pump upgrades including blower replacement, new blower canopy structure, replacement of diffuser system and associated piping, newprocess control system including sensor probes; air control valves; and air flow meters, internal recycle pump replacement, and related civil ; mechanical; electrical; and instrumentation and control improvements. The successful respondents shall utilize an open book approach to the projects and provide pre-construction services and a Guaranteed Maximum Price (GMP) with full disclosure of actual costs to TOHO for the project. Preconstruction responsibilities include, but are not limited to value engineering, construction cost estimating, constructability reviews, associated meetings and conferences, and open-book GMP development. Additionally, the successful respondents shall provide construction phase services, consisting of, but not limited to, administrative services, procurement, construction management, scheduling, supervision and accepted accounting principles throughout the complete project Questions Due Date: Sep 9th 2026, 5:00 PM EDT QA deadline changed from 09/09/2026 as per Adda 1.

GC Bidding

$300,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
177
Bidding Soon
2,324
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2026

November 9, 2026

Project location map

5701 Michigan Ave, Saint Cloud, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed