BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 4, 2026 at 8:00 PM

Updated September 11, 2026

Site work and renovation of a clubhouse / community center in Eagle Lake, Florida. Completed plans call for the renovation of a two-story above grade clubhouse / community center.

Remove the existing shingle roof system to the decking. Repair all saturated or otherwise structurally damaged decking. Up to 2 sheets of plywood are included free if needed to repair decking in the field. 3. Up to 32 LF of tongue-and-groove beadboard is included to repair rotted areas of decking on the overhang, to keep as close to the original look as possible. Any additional will be an additional charge. 4. Install a peel-and-stick underlayment. 5. Install new eave drip (6") and starter course. 6. Remove and replace all attic ventilation, pipe stack flashings, and exhaust vents. 7. Install approximately 30' of wall flashing with counter flashing at brick wall above entryway. 8. Install architectural field shingles and hip/ridge shingles. 9. Install a permanent roof anchor. 10. Replacement of 4 sections of gutter, 56', with 7" K-Style gutter and new downspouts: 11. Disposal, permit, and filing fees included. 12. Shingle Warranty included. Must meet at least 160 mph wind resistance. 13. 10-year warranty on workmanship

Sub-Bidding

$150,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
471
Active Projects
205
Bidding Soon
2,692
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2026

November 2, 2026

Project location map

685 E Eagle Ave, Eagle Lake, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.