Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 3, 2026 at 8:00 PM

Updated October 9, 2026

Renovation of a military facility in Camp Pendleton North, California. Completed plans call for the renovation of a military facility.

The Department of the Navy (DON) is modernizing its aging infrastructure, which continues to degrade due to poor environmental conditions, structural deficiencies, and outdated building systems. The goal is to improve warfighter quality of life, ensuring the warfighter's living and learning environments match the standard of excellence expected on the battlefield. Current military construction processes alone cannot meet the speed or scalability required to achieve the DON's goal to modernize more than $6B of its barracks portfolio while aligning with operational tempo and strategic readiness goals. To address these challenges, the DON seeks to procure new barracks constructed using advanced manufacturing and Industrialized Construction (IC) methods that are capable of delivering highquality, energy-efficient, and resilient facilities. The use of IC must accelerate delivery timelines and reduce both construction and lifecycle costs while delivering increased quality, durability, resilience, and lifecycle performance using a scalable and repeatable modular design and construction methodology. The submission date/time for submission of Requests for Information (RFI) has now closed. Responses to RFIs received prior to this date/time will be posted by Friday, 25 September 26. as per Adda 4.

Post-Bid

$6,500,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
698
Active Projects
267
Bidding Soon
4,662
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2026

November 30, 2026

Project location map

To Be Determined, Camp Pendleton North, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed