Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 29, 2026 at 8:00 PM

Updated October 2, 2026

Demolition, site work, paving and new construction of a civil project in Marianna, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and water / sewer project.

The Improvements under this Contract consist of roadway and pavement reconstruction, guardrail, drainage improvements, removal of existing bridge No. 530026, construction of new bridge No. 534203, signing and pavement markings on CR 278 Peacock Bridge Road over Chipola River Bridge No. 530026 in Jackson County. Project(s): 44905515201(*) Federal Aid No: D326021B Total Roadway Length: 0.760 Miles Total Bridge Length: 0.060 Miles Total Proposal Length: 0.820 Miles Question Deadline 09/23/2026 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. FDOT - 009 - Intermediate Bridge Construction - CR 278 (Peacock Bridge Rd)

Post-Bid

$9,035,014.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
55
Bidding Soon
657
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2026

November 30, 2026

Project location map

Peacock Bridge Rd, Marianna, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed