Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 3, 2026 at 7:00 PM

Updated November 9, 2026

Site work and new construction of a municipal facility in Fort Collins, Colorado. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

Reference Number 0000435389 Develop one or more landfill gas to energy (LFGTE) or other beneficial use projects utilizing landfill gas from the Larimer County Landfill. Question Acceptance Deadline 10/02/2026 12:00 PM EDT Purchasing Agent Les Brown, brownxld@co.larimer.co.us , 970-498-5954 LOCATION AND DESCRIPTION OF WORK A. The Work is located in Fort Collins, Colorado at the Larimer County Landfill (5887 South Taft Hill Road Building F, Fort Collins, CO 80526). The eastern entrance of the Site is located along South Taft Hill Road and will be the primary site entrance. The southwest entrance of the Site is located along West Trilby Road and should only be used for large deliveries. The Work will be limited to the portions of the Site identified in the Project Drawings. B. Work to be performed under this Contract includes but is not limited to the construction of an expansion of the existing landfill gas collection and control system (GCCS) with an enclosed flare/blower station and all other Work required in accordance with the Contract Documents. C. The Project includes the Work broadly described below, in accordance with the Contract Documents, with all related appurtenances. Work shown on the Drawings, or indicated in the Specifications, or indicated elsewhere in the Contract Documents is part of the Work, regardless of whether indicated below. The Work includes, but is not limited to, the following: 1. Mobilization and demobilization of all equipment, materials, and personnel required to complete the Work. 2. Site preparation. 3. Contractor's Health and Safety Plan development and implementation . 4. Using a surveyor licensed in the State of Colorado, establish ground controls; conduct initial site topography survey for required areas within the limits of the Work (see Section 01 71 23 for survey requirements). The Owner will provide existing survey used to develop the bid package in AutoCAD format for the Contractor's use. 5. Attendance and participation of critical personnel at pre-construction meetings. 6. Attendance and participation at weekly construction meetings. 7. Protect any existing on-site utilities, pipes, and structures as shown in the Drawings or discovered during utility locates. 8. Waste excavation, transport, and disposal (on-site).. General earthwork including bulk soil excavation and processing, trenching, backfilling, embankment, and compacting. 10. Boring, casing , and installation of landfill gas (LFG) extraction wells in waste (may require benching). 11. Construction of gas conveyance piping. 12. Construction of condensate sumps and pump assemblies. 13. Construction of isolation valve assemblies (LFG header, air, and forcemain). 14. Construction of access point tie-ins for LFG, air, and forcemain piping. 15. Tie-ins to existing GCCS piping and components. 16. Installation of a blower/flare station. 17. Installation of condensate storage tanks. 18. Miscellaneous structures and appurtenances. 19. Traffic and access controls. 20. Provide a final survey of the entire area of Work within the construction limits . 21. Repair any areas disturbed by the Work, clean up, and demobilize. 22. Closeout documentation.

Post-Bid

$1,500,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
277
Active Projects
94
Bidding Soon
1,621
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2026

January 2, 2027

Project location map

5887 S Taft Hill Rd, Fort Collins, CO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed