BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 4, 2026 at 8:00 PM

Updated September 13, 2026

Site work and paving for a road / highway in Winnipeg, Manitoba. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reference Number 0000331149 SECTION I - PTH 1 (Fermor Ave.) (Project ID No.C07686) Location 1 - (PTH 101 to Symington overpass) (W/B) The work involves construction of bituminous pavement including milling of the existing bituminous pavement on the westbound main lanes of Fermor Ave (excluding Symington overpass bridge deck and approach slabs), from Provincial Trunk Highway 101 to the Symington overpass for a total construction distance of approximately 5.1 km, in the Rural Municipality of Springfield. SECTION II - PTH 1 (Fermor Ave.) (Project ID No.C07687) Location 2 - (PTH 101 to Symington overpass) (E/B) The work involves construction of bituminous pavement including milling of the existing bituminous pavement on the eastbound main lanes of Fermor Ave (excluding Symington overpass bridge deck and approach slabs), from Provincial Trunk Highway 101 to the Symington overpass for a total construction distance of approximately 5.1 km, in the Rural Municipality of Springfield. SECTION III - PTH 101 (Project ID No.C07688) Location 3 - (PTH 15 to PTH 1 (Fermor Ave.)) (E/B) The work involves construction of bituminous pavement including milling of the existing bituminous pavement on the eastbound main lanes of Provincial Trunk Highway 101, from 0.97km south of Provincial Trunk Highway 15 to 0.65km north of PTH 1 (Fermor Ave.), for a total construction distance of approximately ---4.25 km, in the Rural Municipality of Springfield. Location 4 - (PTH 15 to PTH 1 (Fermor Ave.)) (W/B) The Work involves the construction of bituminous pavement including milling of the existing bituminous pavement on the westbound main lanes of Provincial Trunk Highway 101, from 0.6km north of Fermor ave to 1.05km north of PTH 1 (Fermor Ave.) for a total construction distance of approximately ---0.45 km, in the Rural Municipality of Springfield. Bid Bond 10 % Question Deadline 09/18/2026 at 12:00 PM CT Questions are submitted online No Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform

GC Bidding

$1,100,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
34
Bidding Soon
494
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2026

October 22, 2026

Project location map

Fermor Ave, Winnipeg, MB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.