Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 23, 2026 at 8:00 PM
Updated September 29, 2026
Site work and paving for a road / highway in Winnipeg, Manitoba. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Reference Number 0000331149 SECTION I - PTH 1 (Fermor Ave.) (Project ID No.C07686) Location 1 - (PTH 101 to Symington overpass) (W/B) The work involves construction of bituminous pavement including milling of the existing bituminous pavement on the westbound main lanes of Fermor Ave (excluding Symington overpass bridge deck and approach slabs), from Provincial Trunk Highway 101 to the Symington overpass for a total construction distance of approximately 5.1 km, in the Rural Municipality of Springfield. SECTION II - PTH 1 (Fermor Ave.) (Project ID No.C07687) Location 2 - (PTH 101 to Symington overpass) (E/B) The work involves construction of bituminous pavement including milling of the existing bituminous pavement on the eastbound main lanes of Fermor Ave (excluding Symington overpass bridge deck and approach slabs), from Provincial Trunk Highway 101 to the Symington overpass for a total construction distance of approximately 5.1 km, in the Rural Municipality of Springfield. SECTION III - PTH 101 (Project ID No.C07688) Location 3 - (PTH 15 to PTH 1 (Fermor Ave.)) (E/B) The work involves construction of bituminous pavement including milling of the existing bituminous pavement on the eastbound main lanes of Provincial Trunk Highway 101, from 0.97km south of Provincial Trunk Highway 15 to 0.65km north of PTH 1 (Fermor Ave.), for a total construction distance of approximately ---4.25 km, in the Rural Municipality of Springfield. Location 4 - (PTH 15 to PTH 1 (Fermor Ave.)) (W/B) The Work involves the construction of bituminous pavement including milling of the existing bituminous pavement on the westbound main lanes of Provincial Trunk Highway 101, from 0.6km north of Fermor ave to 1.05km north of PTH 1 (Fermor Ave.) for a total construction distance of approximately ---0.45 km, in the Rural Municipality of Springfield. Bid Bond 10 % Question Deadline 09/18/2026 at 12:00 PM CT Questions are submitted online No Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform
Bid Results
$2,197,755.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 22, 2026
October 22, 2026
Fermor Ave, Winnipeg, MB
Related To This Project
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed