Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 2, 2026 at 8:00 PM
Updated November 11, 2026
This is a service / maintenance or supply contract in Vancouver, British Columbia. Contact the soliciting agency for additional information.
Request for Proposals is underway seeking to engage a qualified consulting team to complete a low-carbon cooling infrastructure performance, decarbonization, and resilience strategy for selected PHSA facilities. The primary purpose of this work is to understand current cooling demand and capacity, identify cooling system performance gaps, assess mechanical, controls, electrical, and operational constraints, and develop a practical implementation roadmap that improves cooling system efficiency, reliability, maintainability, and long-term decarbonization outcomes. Resilience to future climate conditions and extreme heat events is an important supporting lens and shall be integrated into the assessment where it affects cooling demand, clinical operations, system reliability, emergency power requirements, and long-term infrastructure planning. The study shall focus first on current cooling performance and current operational limitations, including known thermal comfort concerns, cooling capacity constraints, metering and controls gaps, critical space requirements, and adverse impacts on clinical and building operations. The consulting team shall then assess how these existing issues may be exacerbated under future climate and extreme heat conditions, including the 2050s and 2080s or other appropriate planning horizons agreed with PHSA. The work shall result in a prioritized roadmap for each selected facility that identifies scalable operational, maintenance, recommissioning, renewal, and capital measures. Recommendations should prioritize practical, maintainable, non-proprietary, and operationally manageable solutions that support energy efficiency, greenhouse gas (GHG) emissions reduction, utility cost management, refrigerant transition planning, cooling reliability, clinical service continuity, and resilience to future heat events. The study is intended to support PHSA's Energy and Environmental Sustainability (EES) team, Facilities Maintenance and Operations (FMO), Capital Projects and Planning, clinical and operational stakeholders, Emergency Management, and other internal groups in making informed decisions related to cooling infrastructure renewal, low-carbon system planning, operational improvements, capital prioritization, and future funding applications. Question Deadline 09/15/2026 at 3:00 PM PT
Conceptual
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
To Be Determined, Vancouver, BC
Related To This Project
Vancouver, BC
Bid Date: Dec 04 2026
Vancouver, BC
Bid Date: Dec 01 2026
Vancouver, BC
Bid Date: Dec 04 2026
Vancouver, BC
--
Vancouver, BC
--
Vancouver, BC
Bid Date: Nov 16 2026
Vancouver, BC
Bid Date: Nov 27 2026
Vancouver, BC
--
Vancouver, BC
Bid Date: Dec 18 2026
Vancouver, BC
Bid Date: Nov 09 2026
Vancouver, BC
Bid Date: Nov 04 2026
Vancouver, BC
--
Vancouver, BC
--
Vancouver, BC
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed