Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 7, 2026 at 8:00 PM

Updated October 13, 2026

Site work, paving, new construction and renovation of a civil project in Grover, Wisconsin. Completed plans call for the construction of a bridge / tunnel; for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; road / highway; and road / highway.

Roadway reconstruction and pulverizing including base aggregate placement, HMA paving, shouldering, slope grading, ditch grading, culvert replacements, turf restoration, and erosion control. Replacement of existing bridge with precast structure including concrete headwalls, wingwalls, and backfilling. Bonds: 5% Bid Bond, 100% Performance Bond, 100% Payment Bond. In general, the project consists of 13,250 LF of roadway reconstruction and 10,175 LF of roadway pulverizing, including base aggregate placement, HMA paving, shouldering, slope grading, ditch grading, culvert replacements, turf restoration, erosion control and related work. The project also includes replacement of an existing concrete bridge structure with a 24'-0" span x 8'-0" rise precast bridge structure, including concrete headwalls and wingwalls, backfilling , and related wor Question Deadline 09/22/2026 Requests for such interpretation shall be made to Ayres in writing Contact Trace Hubbard (HubbardT@ayresassociates.com) or Cody Gorges (GorgesC@ayresassociates.com) with questions.

Post-Bid

$1,500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
44
Bidding Soon
453
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2026

December 8, 2026

Project location map

Town Hall Rd, Grover, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed