Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 5, 2026 at 7:00 PM

Updated November 11, 2026

Site work and renovation of a municipal facility in Stockton, California. Completed plans call for the renovation of a municipal facility; and for site work for a municipal facility.

Alteration of Building 315 to be used as Port of Stockton Administration Offices. CONTRACT TIME. Work shall be finally completed within twelve (12) months from the date when Contract Time commences to run. Bidders may submit questions / requests for information (RFI) regarding this bid by email to procurement@stocktonport.com no later than 5:00 PM PST, September 22, 2026. Responses to question and RFI submittals will be issued by Addenda posted to the Port's website www.portofstockton.com no later than September 29, 2026. The second phase of the Building 315 Renovation includes the conversion of warehouse space within the building into usable office space with walls, finishes, lighting, outlets, data communications, plumbing and HVAC. This project work will be performed in an active office building where dust control and noise shall be addressed and accommodated by the contractor. The Work of this Contract comprises construction of all the Work indicated, described in the Specifications, Drawings, or otherwise required by the Contract Documents. If Contractor requires additional fill, it shall obtain the fill from Port as provided in Part 2 below. Port shall charge Contractor $2.00 per cubic yard for fill . If possible, Contractor will pay for imported fill by deduction from next payment application; otherwise, amounts will be due within 30 days of receiving Port invoice. Unless provided otherwise in the Contract Documents, all risk of loss to Work covered by Contract Documents shall rest with Contractor until Final Acceptance of the Work. Cost of maintenance of systems and equipment prior to Final Acceptance will be considered as included in Bid price and no direct or additional payment will be made therefore. Department of Homeland Security Requirements. All Contractor and Subcontractor personnel who will, at any time, be present on the Project Site must obtain a Transportation Worker Identification Credential (TWIC) from the Transportation Security Administration (TSA).

Award

$4,742,091.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
555
Active Projects
175
Bidding Soon
3,627
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2026

November 12, 2026

Project location map

315 Fyffe Ave, Stockton, CA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed