Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 28, 2026 at 8:00 PM

Updated October 31, 2026

Demolition, site work and new construction of a water / sewer project in Indio, California. Completed plans call for the construction of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

As of October 19, 2026, this project has not yet been awarded. A timeline for the award has not yet been established. Question Deadline 09/25/2026 at 5:00 PM PT All questions, requests for interpretations or clarifications, either administrative or technical must be requested in writing and directed to VSD via the District's eProcurement Portal Q&A feature. Conduct a kickoff meeting with District staff to review project objectives, available information, project schedule, communication procedures, operational constraints, and project requirements. o Assign a Project Manager who shall serve as the primary point of contact throughout the duration of the Project. Prepare and maintain a detailed project schedule identifying major milestones, deliverables, review periods, and critical path activities. Monitor and control project budget and schedule throughout the duration of the Project. Conduct progress meetings with District staff throughout the duration of the Project. o Prepare meeting agendas and meeting minutes for all project meetings. Prepare monthly progress reports summarizing work completed, budget status, schedule status, project issues, action items, and upcoming activities. Coordinate activities of all subconsultants and project team members. o Prepare and maintain a project action item log. o Provide all project deliverables in both native electronic format and PDF format. Attend project meetings, presentations, and Board Meetings as requested by the District. o For proposal and fee development purposes, assume the following meetings that may be held virtually: O Assume one (1) Kickoff Meeting. Assume two (2) Operations Workshops. Assume four (4) progress meetings throughout the duration of design. Assume one (1) 30% Design Review Meeting. Assume one (1) 60% Design Review Meeting. Assume one (1) 90% Design Review Meeting Assume one (1) Final Design Review Meeting. Assume one (1) Pre-Bid Meeting. Assume one (1) Project Closeout Meeting

Award

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
125
Bidding Soon
1,849
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed