BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 5, 2026 at 8:00 PM

Updated September 11, 2026

Renovation of an educational facility in Charleston, South Carolina. Completed plans call for the renovation of a educational facility.

Replacement of HVAC equipment along with associated electrical connections. CONSTRUCTION COST RANGE: $ 240,000 to $ 290,000 A/E Action: A/E will review each RFI, determine action required, and respond. Allow seven working days for A/E's response for each RFI. RFIs received by A/E after 1:00 p.m. Question Deadline 09/18/2026 at 1:00 PM ET *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Work of Project is defined by the Contract Documents and consists of the following: Demolish existing HVAC equipment at the building, including 8 DX split system heat pumps and 2 packaged DX units. Associated refrigerant piping shall be removed. Existing duct shall be prepared for new connection in the closet. Roof openings for the packaged units not being replaced shall be capped and sealed. Alternate Bid #1 : In addition the split system unit replacement, provide and alternate bid to add dehumidifiers in each space along with electrical, condensate, mounting and control connections required. Replace electrical connections and breakers where necessary as shown on the drawings or as required based on the replacement HVAC equipment submitted. Provide all ceiling and wall drywall removal and replacement necessary to replace the HVAC and electrical systems. Provide all labor, materials, equipment and supervision to construct complete and operable mechanical systems as indicated on the drawings and specified herein. All materials and equipment used shall be new, undamaged and free from any defects. Contractor shall coordinate the operation of temporary conditioning equipment provided by the owner and construction timeline to maintain the buildings existing temperature and humidity setpoints during construction. The contractor is responsible to contact the MUSC Fire and Life Safety Department to request a hot work permit to allow welding, grinding, brazing and other smoke or dust producing activities to prevent accidental activation of existing fire alarm systems. All materials and equipment demolished shall be removed from site and disposed of properly. The contractor shall provide a record that all hazardous materials have been removed, such as refrigerants, by a qualified recovery subcontractor and provide a copy to the owner's Project Manager. Startup of equipment shall be provided by a factory start up agent. Startup documents shall be provided to the owner's Project Manager. Testing adjusting and balancing of new HVAC systems shall be performed by a qualified TAB contractor.

Sub-Bidding

$290,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
54
Bidding Soon
780
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2026

October 29, 2026

Project location map

20 Ehrhardt Dr, Charleston, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.