Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 8, 2026 at 8:00 PM
Updated September 12, 2026
Site work and new construction of a water / sewer project in Live Oak, Florida. Conceptual plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
Design and engineering for a new water tower at the Suwannee County Catalyst Industrial Park. Questions Due Date: Sep 25th 2026, 5:00 PM EDT Questions Online Portal The method of Contractor Selection has not been Determined at this time.
Conceptual
$450,000.00
Public - County
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 5, 2027
Suwannee County, Live Oak, FL
Related To This Project
Live Oak, FL
Bid Date: Sep 24 2026
Live Oak, FL
Bid Date: Aug 31 2026
Live Oak, FL
Bid Date: Sep 17 2026
Live Oak, FL
Bid Date: Aug 11 2026
Live Oak, FL
Bid Date: Aug 03 2026
Live Oak, FL
Bid Date: Aug 05 2026
Live Oak, FL
Bid Date: Aug 05 2026
Live Oak, FL
Bid Date: Aug 05 2026
Live Oak, FL
Bid Date: Jul 01 2026
Live Oak, FL
Bid Date: Jun 10 2026
Live Oak, FL
Bid Date: Jun 10 2026
Live Oak, FL
Bid Date: May 20 2026
Live Oak, FL
Bid Date: Apr 13 2026
Live Oak, FL
Bid Date: May 21 2026
Live Oak, FL
Bid Date: May 15 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
