Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 5, 2026 at 8:00 PM

Updated October 11, 2026

Site work and renovation of a clubhouse / community center in Mt Juliet, Tennessee. Completed plans call for the renovation of a 14,910-square-foot clubhouse / community center; and for site work for a clubhouse / community center.

Roof replacement for the Mt. Juliet Community Center. Option 1 (PVC): Load roof and install safely Remove existing roof ridge vent along front section of roof gable in preparation for new flute fill roof system Loose lay EPS flute fill insulation boards in between existing metal roof panel across all sections Mechanically fasten 1/2 " High Density EPS cover board over flute fill insulation using appropriately sized fasteners per manufacturer specs. Fasten 50 mil PVC RED membrane over newly installed HD EPS cover board using manufacturer specs Terminate membrane along the gutter edges with vinyl coated drip edge (with a skirt) per manufacturer specs Cut back metal wall panels along the headwalls of the lower roof sections and install a new (L-Bracket) metal while running membrane up the walls and terminating with termination bar per manufacturer specs Cut metal back at the gutter ends of the panels to prevent from allowing water to jump the gutter with new higher system Flash in all pipe penetrations with custom sized stack flashings per manufacturer specs Installs new two-way roof vents per manufacturer specs Flash in all curbs, terminating membrane with the termination bar per manufacturer specs INCORPORATED 1972 Install slip sheet over membrane where the upper roof downspout runs onto lower roof sections All PVC, stack flashing, curb flashing, and one-way vents are to be RED All metals will be white or tan Add faux ribs (red) on the lower section of roof Provide a minimum 20 -year NDL manufacturer warranty Option 2 (Metal): Remove existing roof and haul off all trash and materials Detach gutter hangers at the bottom of existing metal panels Install 24 GA trapezoidal metal panels Install new sidewall and headwall flashing at roof to wall intersections Install new flashing at roof vents and HVAC units Reattach existing g gutters Provide all warranty information *Add on option - Insulation installed as needed (include price per square foot) * **Add on option - Installing new gutters** Option 3: (PVC and Metal): The top roof (above gym) to use PVC 50 mil membrane. (Approx. 7,205 sq. ft) The lower roof to use 24 GA trapezoidal metal panels. (Approx. 7,535 sq. ft) Include all specs from Option 1 and Option 2

Award

$129,952.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
56
Bidding Soon
1,381
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2026

October 23, 2026

Project location map

1075 Charlie Daniels Pkwy, Mt Juliet, TN


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed