Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 23, 2026 at 8:00 PM
Updated October 26, 2026
Site work for a water / sewer project in Kyle, Texas. Completed plans call for site work for a water / sewer project.
Expansion of the Wastewater Treatment Plant involving full works package construction. The Work shall include all civil , architectural, structural, mechanical , HVAC, electrical and instrumentation work covered by the Contract Documents for the Kyle WWTP Expansion Phase 2 Full Works Package. The Work shall include (but is not limited to): furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of the following: 1. Package plant modifications; 2. Package plant blowers modifications; New grit removal facility; Headworks and influent lift station modifications; Aeration splitter box expansion; The Base Contract includes expansion of the Aeration Splitter Box to its base configuration without the two (2) additional chambers. b. Construction of two (2) additional chambers at the Aeration Splitter Box is not included in the Base Bid and shall be performed only if Alternate No. 2 is accepted by the Owner. Existing aeration basins modifications; New aeration basins with 2 treatment trains; Blower building modifications, including structural , architectural , HVAC, mechanical, electrical and instrumentation; Clarifier splitter box and RAS/WAS pump station modifications; New clarifiers; New scum pump stations; . Consolidated chemical facility modifications;. New rapid mixers and flocculators; . New post-aeration basin; . New aerobic digesters; . New effluent flow meter; . New odor control systems; . New storage building; . Site civil improvements, including demolition, paving, grading, drainage and yard piping; . CMU retaining wall and landscaping improvements; . All associated electrical, instrumentation, and controls improvements; . All other miscellaneous requirements necessary for the installation of complete operable systems. . For Proposal Form descriptions of the Work refer to Section 01025 - Measurement and Payment. Project site address: 455 Heidenreich Lane, Kyle, Texas 78740. The Kyle WWTP Expansion Phase 2 EWP Contractor with a contractual Final Completion date of February 7, 2027 Question Deadline 10/05/2026 at 3:00 PM CT Question submitted electronically. SCOPE OF WORK The City of Kyle WWTP is an operational wastewater treatment plant that must remain in service throughout construction and must comply at all times with the Texas Commission on Environmental Quality (TCEQ) Rules and Regulations, the United States Environmental Protection Agency (US EPA) Safe Drinking Water Act requirements and must continue to provide treatment capacity for customer demands and to ensure National Pollutant Discharge Elimination System (NPDES) permit compliance. Any disruption to the Plant's ability to treat wastewater will have a drastic effect upon the City's wastewater system. It is imperative that the plant remains in operation throughout construction and that the construction of the Work remain on schedule. The City of Kyle WWTP Expansion Phase 2 has been broken into the Early Work Project (EWP) and the Full Work Project (FWP). The EWP work is anticipated to reach Critical Beneficial Use by 11/20/2026. The EWP included the installation of deep excavated yard process piping segments, shown in the Drawings, which were plugged at both ends and tagged for location and connection to as part of the FWP. The Owner and Engineer have attempted herein to define operational constraints, provide parameters to consider in the Contractor's baseline progress schedule to achieve Substantial Completion, and to provide the Contractor with sufficient information to best ensure completion in a structured progression to allow sufficient time to complete construction activities.
Post-Bid
$130,000,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 22, 2026
December 21, 2026
445 Heidenreich Ln, Kyle, TX
Related To This Project
Kyle, TX
--
Kyle, TX
Bid Date: Oct 07 2026
Kyle, TX
Bid Date: Oct 23 2026
Kyle, TX
Bid Date: Oct 23 2026
Kyle, TX
Bid Date: Oct 28 2026
Kyle, TX
--
Kyle, TX
--
Kyle, TX
Bid Date: Sep 10 2026
Kyle, TX
--
Kyle, TX
--
Kyle, TX
--
Kyle, TX
--
Kyle, TX
Bid Date: Aug 06 2026
Kyle, TX
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed