Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 15, 2026 at 8:00 PM

Updated November 1, 2026

Site work and new construction of a municipal facility in Atlanta, Georgia. Completed plans call for the construction of a municipal facility.

Construction management at risk services for the District 7 Administration Office. Question Deadline 09/16/2026 at 2:00 PM ET All relevant and significant questions that have been submitted in writing via email Jeff Lacks Jeff.lacks@gsfic.ga.gov 770-550-3774 Project Description: The Georgia Department of Transportation is divided into seven districts which are responsible for operating and maintaining the transportation system at the local level . In support of those efforts, GDOT intends to replace an existing office currently located in Chamblee with a new Administration Office to serve its District7 region . The new building will be constructed adjacent to their existing Traffic Management Center located at 935 East United Avenue, Atlanta, Georgia 30316. The preliminary Stated Cost Limitation (SCL) or construction cost of the Project is estimated at $22,000,000. The final SCL may be revised by the Owner due to final programmatic requirements, funding availability or other circumstances. To assist with early planning for the project, GDOT engaged the architectural firm Wiley Wilson to develop a preliminary concept of possible program spaces. While the concept resulted in a multi-story building comprising roughly 78,000 square feet of space for staff offices, conference rooms, training assembly spaces, breakrooms, storage and other support spaces, the Owner recognizes the new building's design and size will be influenced by what the construction budget can support. The design professional selection was recently completed, and we are working to finalize the contract with the selected firm . The final program and space needs will be determined during the programming effort with the selected design professional. During the preconstruction process, the CM/GC will be instrumental in assisting the team determine what can be constructed with the available funding.

Post-Bid

$22,000,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
353
Active Projects
152
Bidding Soon
2,413
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2026

February 1, 2027

Project location map

935 United Ave SE, Atlanta, GA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed