Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 10, 2026 at 8:00 PM
Updated September 14, 2026
Site work and renovation of a clubhouse / community center in Detroit, Michigan. Completed plans call for the renovation of a clubhouse / community center; and for site work for a clubhouse / community center.
Design-build services for HVAC upgrades including rooftop unit replacement. Question Deadline 09/29/2026 at 2:00 PM ET All questions must be submitted online in the Supplier Portal The major improvement tasks for this project includes by not limited to: HVAC Niagara controls City of Detroit Office of Contracting and Procurement (OCP) Request for Proposal # 549815 - CDD Northwest Activities Center (NWAC) RTU Replacement Remove and replace existing rooftop units (RTUs) Remove and reconnect electrical services to support the HVAC equipment, as needed Remove and reconnect plumbing and gas lines to support the HVAC equipment, as needed Remove and reconnect fire alarm systems (if sensors are located in rooftop units) Abatement, as needed Roof repairs resulting from RTU installation, including but not limited to curb adapters and roof curb installation Equipment removal and disposal Temporary covers and safety measures HVAC Upgrades: HVAC upgrades will be performed on a design-build basis. Scope may vary pending CDD's review and approval. Provide a complete assessment of the existing RTUs, VAVs, and control system. Report to CDD the findings and recommendations. Once recommendations are reviewed and approved by owner, implement approved scope for RTUS, VAVs, and control system. If approved, provide a complete DDC system for rooftop units, integrated with the city's front-end Niagara Tridium control system. New RTUs to be Carrier or York or equivalent. Repair of any pavement, concrete, siding, landscaping caused by demolition, removal, and construction activities. Perform complete duct cleaning throughout Perform complete air balance throughout Conduct certified commissioning of all equipment. Confirm gas pressure is within specification, verify voltage and phase rotation are correct, and check that airflow meets required levels. Run functional tests on all controls to confirm they operate as intended.
Sub-Bidding
$330,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 20, 2026
November 4, 2026
18100 Meyers Rd, Detroit, MI
Related To This Project
Detroit, MI
Bid Date: Oct 08 2026
Detroit, MI
Bid Date: Sep 22 2026
Detroit, MI
Bid Date: Sep 16 2026
Detroit, MI
Bid Date: Oct 01 2026
Detroit, MI
Bid Date: Sep 18 2026
Detroit, MI
Bid Date: Oct 02 2026
Detroit, MI
Bid Date: Nov 02 2026
Detroit, MI
Bid Date: Oct 01 2026
Detroit, MI
Bid Date: Sep 30 2026
Detroit, MI
Bid Date: Sep 15 2026
Detroit, MI
Bid Date: Sep 22 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
